Author Topic: Nova Scotia outlook / 5-Year Plans  (Read 5801 times)

0 Members and 1 Guest are viewing this topic.

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4234
  • Last Login:February 13, 2024, 07:19:36 pm
  • I like C++
Nova Scotia outlook / 5-Year Plans
« on: January 10, 2018, 02:33:31 pm »
Five Year Plan   |  Highway Construction Projects
Twinning  |  Final presentation.pdf  |  https://hwy104twinning.ca/

10-11 | 11-12 | 12-13 | 13-14 | 14-15 | 15-16 | 16-17 | 17-18 | 18-19 | 19-20
20-21 | 21-22 | 22-23 | 23-24


2012-13:
Trunk 1; Granite Drive Roundabout (including a portion of the future Highway 101 Connector, New Minas

2016-17:
Highway 101/102 Interchange Structure & Ramp Modifications
(Last appears in 2012-13 plan. Has this been backburnered?)

2018-19:
Highway 101: Granite Dr Interchange and Connector (Fall 2018)
Highway 104: Taylor Road to Monastery - Paqtnkek Interchange


2019-20:
Highway 101: Digby to Marshalltown (October 2018) (End of summer 2019)

2020-21:
Highway 105: Route 252 Waycobah, access improvements

2021-22:
Highway 102: Lantz Interchange and Connector (Jan 2022)
Highway 103: Upper Tantallon to Ingramport Twinning
Summer 2022: Mira Gut Truss Bridge: Route 255

Trunk 14: Intersection improvement at Route 215 in Newport (Petro Canada)
Trunk 28: Seaside Drive intersection improvements Trunk 28 and Gardiner Drive

2022-23:
Highway 104 / Route 344: Aulds Cove Intersection Realignment, access improvements
Highway 105/104: Port Hastings, rotary upgrades
Trunk 4: Trunk 4/16 Intersection improvements

2023-24:
Highway 102: Aerotech Connector
Highway 103 Twinning: Ingramport to Hubbards
Highway 103: Bridgewater Interchange (Exits 12-13)
Highway 107: Burnside to Bedford Phase 1
Summer 2024: Exit 28

2024-25:
Highway 104: Twinning: Sutherlands River - Barneys River Station
Highway 104 New alignment: Barneys River Station - Pushie Road
Highway 104: Twinning: Pushie Road - Antigonish

2025-26:
Highway 101: Three Mile Plains to Falmouth Twinning (Multiple Year Project)

2026-27:
Highway 103: Argyle Interchange (Multiple Year Project)

2027-28:
Highway 103 Twinning: Exit 6 to Exit 7 (Multiple Year Project)
Highway 103 Twinning: Exit 7 to 8 (Multiple Year Project)
Highway 104 Twinning: Taylors Road to Paqtnkek (Multiple Year Project)
Highway 107 Twinning: Burnside to Lake Loon (Multiple Year Project)
« Last Edit: October 13, 2023, 12:08:29 am by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4234
  • Last Login:February 13, 2024, 07:19:36 pm
  • I like C++
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca