Travel Mapping

Highway Data Discussion => 6-Month+ Highway Data Outlook => Topic started by: yakra on September 21, 2017, 03:28:02 am

Title: Alberta outlook
Post by: yakra on September 21, 2017, 03:28:02 am
CHM forum thread (http://clinched.s2.bizhat.com/viewtopic.php?t=2188)
http://www.transportation.alberta.ca/projects/
https://www.transportation.alberta.ca/documents/2017-20ProvincialConstructionProgram.pdf

AB28:
Quote
Various curve revisions: west of Redwater,
Hwy. 38, north of Redwater
AB38 reconfig shown in Google; no free sources yet (OSM, BingSat, GeoBase 14.0: 2018-01-21)
Title: Re: Alberta outlook
Post by: oscar on August 28, 2018, 11:16:33 pm
In case it's not already on your radar, AB 43X is being extended to meet AB 43 west of Grande Prairie, to create a northern bypass of the city. That would let through travelers avoid the painful slog through the city that I endured earlier today. The extension does not look like opening is imminent.
Title: Re: Alberta outlook
Post by: yakra on October 24, 2018, 11:14:37 pm
AB14 Corridor Plan
http://www.beaver.ab.ca/public/download/documents/2332

AB43X target date = summer 2019
https://www.mygrandeprairienow.com/44544/highway-43x-roundabout-to-open-friday/
https://everythinggp.com/article/541443/summer-2019-new-target-completion-time-highway-43x

AB834 Tofield bypass, anticipated fall 2020
https://www.alberta.ca/release.cfm?xID=46766B22D1472-E30D-3954-EFDF3531751BE4A5
https://www.transportation.alberta.ca/6070.htm
https://tofieldmerc.com/?p=5198
Title: Re: Alberta outlook
Post by: yakra on September 02, 2019, 09:22:47 am
Reports from mid-July said the AB43X extension would be open by the end of August. I've not found any more recent news of the actual opening.
Title: Re: Alberta outlook
Post by: yakra on September 04, 2019, 11:55:42 am
Posted a day too soon:
Highway 43X bypass now hoped to open by mid-September (https://www.mygrandeprairienow.com/61030/officials-now-hope-to-open-highway-43x-bypass-by-mid-september/)
Title: Re: Alberta outlook
Post by: yakra on September 24, 2020, 05:09:53 pm
Recent: Alberta openings #4194 (https://github.com/TravelMapping/HighwayData/pull/4194)
• AB43 relocated onto AB43X (https://forum.travelmapping.net/index.php?topic=3225)
• AB201 (Woodbine) opened
• AB201SCa extended, 5->9
• AB201 (Signal Hill) added


Watchlist

Check signage / GMSV
ItemImagery    Retrieved
Old AB453, Grande Prairie(pre-2019)(before 2020-09-24)
AB201SCa/22X: Exit 6 really 7?U/C2021-05-10)

ToDo:
AB28/651 jct
AB28/38 jct
AB63 N terminus
CSVs into credits.php
routings/termini from CSVs

2020
end of this year: (https://calgary.ctvnews.ca/tsuut-ina-trail-section-of-calgary-ring-road-opens-to-traffic-ceremony-interrupted-by-displaced-family-1.5128206) AB201 exits 9-13 (This is contradicted by every other source I've seen)

2021
Before summer? (https://tofieldmerc.com/2020/07/10/hwy-834-bypass-construction-underway/) Fall (https://www.beaver.ab.ca/public/download/files/114487) Tofield bypass
10/01: AB201 exits 9-13
Fall? (https://www.beaver.ab.ca/public/download/files/114487) Tofield bypass

2023
Fall (https://calgary.ctvnews.ca/construction-begins-on-83m-qeii-interchange-project-near-airdrie-1.5405963): AB2 interchange @ 40th Avenue, Airdrie

2024-10-01: AB201 north of Hwy 8 to Exit 36
When? AB201 along AB8 from Exit 22, I'd expect at that same time or maybe sooner if it gets upgraded along the way.
Title: Re: Alberta outlook
Post by: yakra on October 01, 2021, 05:03:16 pm
Quote from: https://calgaryherald.com/news/local-news/final-sections-of-southwest-portion-of-calgary-ring-road-set-to-open-this-weekend
The final stretch of the southwest Calgary ring road is scheduled to open Saturday.

A member of the project team said the last sections of the road stretching from Fish Creek Boulevard to Highway 22X is scheduled to open at 4 p.m., although the provincial government would not confirm the opening, saying there will be an announcement about the section “shortly.”
Quote
The west portion of the ring road is scheduled to be completed in 2023, the South Bow River Bridge project is scheduled to be complete in 2023 and the northeast Stoney Trail widening project is scheduled to be finished later this year.
Title: Re: Alberta outlook
Post by: yakra on October 03, 2021, 05:15:26 pm
Done
#5179 merge AB201SCa into AB201SWC (https://github.com/TravelMapping/HighwayData/pull/5179)
#5612 Tofield bypass (https://github.com/TravelMapping/HighwayData/pull/5612)


Watchlist

Check signage / GMSV
ItemImagery    Retrieved
Old AB43, Grande PrairieJul 2022 (https://www.google.com/maps/@55.17069,-118.8182769,3a,15y,294.09h,90.19t/data=!3m10!1e1!3m8!1sYR-JqA-PYNUykQVPWNsGGw!2e0!5s20220701T000000!7i16384!8i8192!9m2!1b1!2i40)2022-11-05

2023
Summer (https://www.calgary.ca/planning/projects/stoney-trail.html): AB201 @ 11 St NE
Fall (https://calgary.ctvnews.ca/construction-begins-on-83m-qeii-interchange-project-near-airdrie-1.5405963): AB2 interchange @ 40th Avenue, Airdrie

2024
10-01: West Calgary Ring Road (https://www.alberta.ca/west-calgary-ring-road.aspx#jumplinks-1)
Title: Re: Alberta outlook
Post by: yakra on October 13, 2023, 09:21:15 am
Done
#6880 AB201 extended to exit 32 (https://github.com/TravelMapping/HighwayData/pull/6880)


Watchlist

Check signage / GMSV
ItemImagery    Retrieved
Old AB43, Grande PrairieJul 2022 (https://www.google.com/maps/@55.17069,-118.8182769,3a,15y,294.09h,90.19t/data=!3m10!1e1!3m8!1sYR-JqA-PYNUykQVPWNsGGw!2e0!5s20220701T000000!7i16384!8i8192!9m2!1b1!2i40)2022-11-05

2023
10-13: AB2 interchange @ 40th Avenue, Airdrie (confirm exit number (https://www.aaroads.com/forum/index.php?topic=9720.msg2875883#msg2875883))
Fall (https://www.calgary.ca/planning/projects/stoney-trail-11-st-ne.html): AB201 @ 11 St NE

2024
10-01: West Calgary Ring Road (https://www.alberta.ca/west-calgary-ring-road.aspx#jumplinks-1)

2025
Fall (https://www.alberta.ca/cochrane-interchange): AB1A/22 (https://majorprojects.alberta.ca/details/Highway-1A-Highway-22-Interchange/3455)

2026
Yellowhead Trail Freeway Conversion (https://majorprojects.alberta.ca/details/Yellowhead-Trail-Freeway-Conversion/2507)
Title: Re: Alberta outlook
Post by: yakra on January 01, 2024, 10:30:26 am
Done
AB2 interchange @ 40th Avenue, Airdrie (https://github.com/TravelMapping/HighwayData/pull/7124/commits/cdad6091b61a4a69f6321cff84666b71b8f84bf5)
West Calgary Ring Road (https://github.com/TravelMapping/HighwayData/pull/7124/commits/0a9b33c0115fba36945bfc5576a0542546d5f730)


Watchlist

Check signage / GMSV
ItemImagery    Retrieved
Old AB43, Grande PrairieJul 2022 (https://www.google.com/maps/@55.17069,-118.8182769,3a,15y,294.09h,90.19t/data=!3m10!1e1!3m8!1sYR-JqA-PYNUykQVPWNsGGw!2e0!5s20220701T000000!7i16384!8i8192!9m2!1b1!2i40)2022-11-05

2023
Fall (https://www.calgary.ca/planning/projects/stoney-trail-11-st-ne.html): AB201 @ 11 St NE (confirm (https://www.aaroads.com/forum/index.php?topic=9720.msg2895418#msg2895418))

2025
Fall (https://www.alberta.ca/cochrane-interchange): AB1A/22 (https://majorprojects.alberta.ca/details/Highway-1A-Highway-22-Interchange/3455)

2026
Yellowhead Trail Freeway Conversion (https://majorprojects.alberta.ca/details/Yellowhead-Trail-Freeway-Conversion/2507)