Author Topic: NV: So, when do we add I-11?  (Read 6432 times)

0 Members and 1 Guest are viewing this topic.

Offline NickCPDX

  • TM Collaborator
  • Newbie
  • *****
  • Posts: 18
  • Last Login:January 29, 2024, 05:33:52 pm
NV: So, when do we add I-11?
« on: September 03, 2017, 01:58:57 pm »
Now that it's clear that the Boulder City Bypass will be called "I-11" by at least someone once it fully opens, when do we add it to the system?


  • Now that the first (very short, and parallel to old alignment) segment has opened?
  • When we have confirmation that it's signed?
  • When it's approved by AASHTO?
  • When it extends to US 95?
  • When it's all the way around Boulder City in 2018?

Guidance appreciated.
« Last Edit: May 21, 2018, 11:33:13 am by michih »

Online si404

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1944
  • Last Login:Today at 10:50:23 am
Re: So, when do we add I-11?
« Reply #1 on: September 05, 2017, 02:04:17 pm »
Now that the first (very short, and parallel to old alignment) segment has opened?
I'm not sure there's two waypoints to be got there without stretching it - leave off unless signed.
Quote
When we have confirmation that it's signed?
If signed, then add.
Quote
When it's approved by AASHTO?
Pretty sure it is. Certainly AASHTO didn't bat an eyelid at the existence of I-11 when the applications for US93 and US95 changes routing it onto new I-11 were approved by them in the Spring.
Quote
When it extends to US 95?
At least then there would be a route with two points!
Quote
When it's all the way around Boulder City in 2018?
That might be a bit after the fact.

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1627
  • Last Login:Today at 10:09:32 am
Re: So, when do we add I-11?
« Reply #2 on: September 06, 2017, 10:28:25 am »
If signed, then add.
It wasn't signed (other than some "Future I-11" signs) in either state along US 93 last month.
Clinched:

Offline Duke87

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 938
  • Last Login:Yesterday at 04:26:16 pm
Re: So, when do we add I-11?
« Reply #3 on: September 08, 2017, 07:26:16 pm »
When we have confirmation that it's signed?

This one.

Offline NickCPDX

  • TM Collaborator
  • Newbie
  • *****
  • Posts: 18
  • Last Login:January 29, 2024, 05:33:52 pm
Re: So, when do we add I-11?
« Reply #4 on: September 09, 2017, 04:23:13 pm »
Well, looks like we have some clarity - signs are on order for I-11 from the I-215/NV 564 interchange in Henderson to the new alignment. I-515 has been decommissioned in this stretch.

https://lasvegassun.com/news/2017/sep/09/more-interstate-11-signs-on-the-way/

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1829
  • Gender: Male
  • Last Login:Today at 06:11:34 am
Re: So, when do we add I-11?
« Reply #5 on: September 09, 2017, 05:56:13 pm »
Well, looks like we have some clarity - signs are on order for I-11 from the I-215/NV 564 interchange in Henderson to the new alignment. I-515 has been decommissioned in this stretch.

https://lasvegassun.com/news/2017/sep/09/more-interstate-11-signs-on-the-way/

I'd still wait till the signs are in the field, as it still could be another 2 months till that might happen.

Offline Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2732
  • Last Login:Today at 10:27:44 am
Re: So, when do we add I-11?
« Reply #6 on: September 09, 2017, 10:20:59 pm »
I will leave this to everyone else to make a decision, but I'll point out that we seem to have inherited from CHM some usai-specific rules, by which we include routes that are legally interstates even if not signed (yet, in this case) as such.  This includes hidden designations.

I did not merge in the pull requests related to this pending some further discussion and consensus here, and since the csv files did not appear to be updated.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1829
  • Gender: Male
  • Last Login:Today at 06:11:34 am
Re: So, when do we add I-11?
« Reply #7 on: September 10, 2017, 02:49:46 am »
I will leave this to everyone else to make a decision, but I'll point out that we seem to have inherited from CHM some usai-specific rules, by which we include routes that are legally interstates even if not signed (yet, in this case) as such.  This includes hidden designations.

Well, I wanted to make I-69's TN file in the Memphis area official after the AASHTO approval, but I was overruled into making it as a 'Future' route.

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4234
  • Last Login:February 13, 2024, 07:19:36 pm
  • I like C++
Re: So, when do we add I-11?
« Reply #8 on: September 10, 2017, 03:06:06 am »
Quote
we seem to have inherited from CHM some usai-specific rules, by which we include routes that are legally interstates even if not signed (yet, in this case) as such.  This includes hidden designations.
Includes hidden designations.
Limited to hidden designations?
It may be, from what I remember... For designations that aren't intended to be hidden, seems we wait for signage, etc. That's the route I've been taking with TX I-69*.
I don't have any skin in this particular game, other than wanting that things be done properly for the project, however that may be.
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Online si404

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1944
  • Last Login:Today at 10:50:23 am
Re: So, when do we add I-11?
« Reply #9 on: September 17, 2017, 11:16:45 am »
There is a sign now. see AARoads

Offline Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2732
  • Last Login:Today at 10:27:44 am
Re: So, when do we add I-11?
« Reply #10 on: September 17, 2017, 01:44:31 pm »
So do we have some agreement that the changes in the open pull requests 1596-1599 can be merged?

Offline NickCPDX

  • TM Collaborator
  • Newbie
  • *****
  • Posts: 18
  • Last Login:January 29, 2024, 05:33:52 pm
Re: So, when do we add I-11?
« Reply #11 on: September 17, 2017, 04:27:44 pm »
Update - there is at least I-11 shield posted now on the Nevada segment.

Offline Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2732
  • Last Login:Today at 10:27:44 am
Re: So, when do we add I-11?
« Reply #12 on: September 17, 2017, 09:41:50 pm »
Also if we're going to merge those in, the usaif and usai csv files need updating too.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1829
  • Gender: Male
  • Last Login:Today at 06:11:34 am
Re: So, when do we add I-11?
« Reply #13 on: October 11, 2017, 03:20:42 am »
I see this was pulled in.

However, since it isn't opened yet to US-95 (between exits 14 & 15), I don't think that part should be shown yet.  Plus, somebody has it marked as 'clinched' already which shouldn't be even possible. 

If we aren't going to remove that section, US-93 & US-95's files need be updated to have the 'new' location for '15' (which should really be '15B').  Also, US-95 should have the point for exit 14 added as well.

As for I-11's file itself, we'll need to add '15A' for the Railroad Pass Casino Road interchange.  Why you may ask?  Well, it's simple.  '15A' is a complete interchange, while '15B' isn't.  '15A' fills in the missing movements from '15B', plus we have US-93/95 leaving I-11 (well, for now) @ '15A'.  (on a side note, US-93 'Business' & US-95 would also need the companion part too for Railroad Pass Casino Road.

Offline dave1693

  • Full Member
  • ***
  • Posts: 185
  • Last Login:November 21, 2023, 11:28:54 pm
Re: So, when do we add I-11?
« Reply #14 on: October 13, 2017, 01:34:08 pm »
Not that I have any skin in this -- haven't been south of the Vegas airport in NV. But I am curious about the exit numbering on I-11, which appears to change abruptly from mileage-from-AZ/NV to what I presume is mileage from a putative south end of proposed I-515. Is Nevada planning to do anything about that?