Highway Data Discussion => 6-Month+ Outlook => Topic started by: yakra on September 21, 2017, 03:28:02 am

Title: Alberta outlook
Post by: yakra on September 21, 2017, 03:28:02 am
CHM forum thread (http://clinched.s2.bizhat.com/viewtopic.php?t=2188)
http://www.transportation.alberta.ca/projects/
https://www.transportation.alberta.ca/documents/2017-20ProvincialConstructionProgram.pdf

AB28:
Quote
Various curve revisions: west of Redwater,
Hwy. 38, north of Redwater
AB38 reconfig shown in Google; no free sources yet (OSM, BingSat, GeoBase 14.0: 2018-01-21)
Title: Re: Alberta outlook
Post by: oscar on August 28, 2018, 11:16:33 pm
In case it's not already on your radar, AB 43X is being extended to meet AB 43 west of Grande Prairie, to create a northern bypass of the city. That would let through travelers avoid the painful slog through the city that I endured earlier today. The extension does not look like opening is imminent.
Title: Re: Alberta outlook
Post by: yakra on October 24, 2018, 11:14:37 pm
AB14 Corridor Plan
http://www.beaver.ab.ca/public/download/documents/2332

AB43X target date = summer 2019
https://www.mygrandeprairienow.com/44544/highway-43x-roundabout-to-open-friday/
https://everythinggp.com/article/541443/summer-2019-new-target-completion-time-highway-43x

AB834 Tofield bypass, anticipated fall 2020
https://www.alberta.ca/release.cfm?xID=46766B22D1472-E30D-3954-EFDF3531751BE4A5
https://www.transportation.alberta.ca/6070.htm
https://tofieldmerc.com/?p=5198