Author Topic: Nova Scotia outlook / 5-Year Plans  (Read 1129 times)

0 Members and 1 Guest are viewing this topic.

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2040
  • Last Login:Today at 01:52:50 am
Nova Scotia outlook / 5-Year Plans
« on: January 10, 2018, 02:33:31 pm »
Twinning  |  Final presentation.pdf
Highway Construction Projects
Five Year Plan
PDFs: 10-11  |  11-12  |  12-13  |  13-14  |  14-15  |  15-16  |  16-17  |  17-18  |  18-19  |  19-20

2012-13:
Trunk 1; Granite Drive Roundabout (including a portion of the future Highway 101 Connector, New Minas

2016-17:
Highway 101/102 Interchange Structure & Ramp Modifications
 (Last appears in 2012-13 plan. Has this been backburnered?)

2018-19:
Highway 101: Granite Dr Interchange and Connector (Fall 2018)
Highway 104: Taylor Road to Monastery - Paqtnkek Interchange

2019-20:
Highway 101: Digby to Marshalltown (October 2018) (End of summer 2019)

2021-22:
Highway 102: Aerotech Connector
Highway 102: Lantz Interchange and Connector

2022-23:
Highway 107: Burnside to Bedford Phase 1
« Last Edit: July 06, 2019, 10:41:18 am by yakra »

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2040
  • Last Login:Today at 01:52:50 am