Author Topic: NC: Named Freeway Question  (Read 1028 times)

0 Members and 1 Guest are viewing this topic.

Online mapmikey

  • TM Collaborator
  • Sr. Member
  • *****
  • Posts: 320
  • Last Login:Today at 06:03:54 am
    • Co-curator Virginia Highways Project
Re: NC: Named Freeway Question
« Reply #15 on: September 22, 2018, 10:59:46 am »
Have synched the point up but am waiting on the AASHTO meeting before I change the name...
Clinched:
I: 4 12 16 17 20 26 27 30 59 64 66 68 72 73 ew74 77 78 79 82 83 ew84 85 ew86 e88 97 99
US: 4 6N 9W 11E 11W 13 15 19W 21 44 46 48 58 72 92 113 117 123 130 158 163 176 178 192 206 209 211 219 220 221 222 258 264 276 290 311 319 322 340 360 378 401 ew422 501 521 522 601 701
PriSystems: VA, DE

Online neroute2

  • Jr. Member
  • **
  • Posts: 73
  • Last Login:Today at 06:09:15 am
Re: NC: Named Freeway Question
« Reply #16 on: October 09, 2018, 01:40:47 pm »
The new file is in the HB. However, the north endpoint should be labeled NC295 or I-295Fut, not I-295, and should be synched to the corresponding point (21A) in the NC295 and I-295FutFay files.
Why is the south end not at OwenDr?

Online mapmikey

  • TM Collaborator
  • Sr. Member
  • *****
  • Posts: 320
  • Last Login:Today at 06:03:54 am
    • Co-curator Virginia Highways Project
Re: NC: Named Freeway Question
« Reply #17 on: November 17, 2018, 11:04:31 am »
I have added the Owen Dr point and is in the queue
Clinched:
I: 4 12 16 17 20 26 27 30 59 64 66 68 72 73 ew74 77 78 79 82 83 ew84 85 ew86 e88 97 99
US: 4 6N 9W 11E 11W 13 15 19W 21 44 46 48 58 72 92 113 117 123 130 158 163 176 178 192 206 209 211 219 220 221 222 258 264 276 290 311 319 322 340 360 378 401 ew422 501 521 522 601 701
PriSystems: VA, DE