Title: AZ: AZ 24 Extension to Ironwood Dr
Post by: Markkos1992 on April 04, 2022, 08:07:50 pm
The extension to Williams Field Road opened last Friday.

https://www.abc15.com/news/region-southeast-valley/mesa/new-stretch-of-sr-24-opens-in-mesa-full-project-expected-to-be-completed-in-summer-2022

https://www.aaroads.com/forum/index.php?topic=14850.msg2724095#msg2724095

My understanding is that the rest will open in a couple months.
Title: Re: AZ: AZ 24 Extension to Ironwood Dr
Post by: Duke87 on April 05, 2022, 07:59:25 pm
Ha, I was staring at this out the window of an airplane as I was leaving PHX last... Thursday, and determined from that view that it was not open yet. Missed it by a day it looks like!

Will address.

EDIT: extension to Williams Field has been addressed, thread moved to Outlook forum since there is further extension still under construction
Title: Re: AZ: AZ 24 Extension to Ironwood Dr
Post by: Markkos1992 on August 02, 2022, 12:05:23 pm
This should open in the next 2-3 weeks or so.  (https://www.aaroads.com/forum/index.php?topic=14850.msg2759222#msg2759222)
Title: Re: AZ: AZ 24 Extension to Ironwood Dr
Post by: Markkos1992 on August 12, 2022, 06:46:30 am
Or 9 days (https://www.aaroads.com/forum/index.php?topic=14850.msg2761883#msg2761883)

Also to keep in mind:

Quote
The city of Mesa is working to complete the Signal Butte Road interchange, set to open in 2023, which will connect SR 24 to an extended Signal Butte Road. While that construction takes place, drivers exiting SR 24 at Williams Field Road can access Signal Butte north of the new expressway. Meanwhile, Meridian Road’s access is limited to and from the area south of SR 24, since the road does not extend north of the highway.