Highway Data Discussion > Solved Highway data updates

AZ: AZ 24 Extension to Ironwood Dr

(1/1)

Markkos1992:
The extension to Williams Field Road opened last Friday.

https://www.abc15.com/news/region-southeast-valley/mesa/new-stretch-of-sr-24-opens-in-mesa-full-project-expected-to-be-completed-in-summer-2022

https://www.aaroads.com/forum/index.php?topic=14850.msg2724095#msg2724095

My understanding is that the rest will open in a couple months.

Duke87:
Ha, I was staring at this out the window of an airplane as I was leaving PHX last... Thursday, and determined from that view that it was not open yet. Missed it by a day it looks like!

Will address.

EDIT: extension to Williams Field has been addressed, thread moved to Outlook forum since there is further extension still under construction

Markkos1992:
This should open in the next 2-3 weeks or so.  (https://www.aaroads.com/forum/index.php?topic=14850.msg2759222#msg2759222)

Markkos1992:
Or 9 days (https://www.aaroads.com/forum/index.php?topic=14850.msg2761883#msg2761883)

Also to keep in mind:


--- Quote ---The city of Mesa is working to complete the Signal Butte Road interchange, set to open in 2023, which will connect SR 24 to an extended Signal Butte Road. While that construction takes place, drivers exiting SR 24 at Williams Field Road can access Signal Butte north of the new expressway. Meanwhile, Meridian Road’s access is limited to and from the area south of SR 24, since the road does not extend north of the highway.
--- End quote ---

Navigation

[0] Message Index

Go to full version