Author Topic: Quebec outlook  (Read 12728 times)

0 Members and 2 Guests are viewing this topic.

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1581
  • Last Login:Today at 11:13:36 am
    • Hot Springs and Highways pages
Quebec outlook
« on: September 29, 2018, 07:17:54 pm »
Autoroute 720 in Montreal is being downgraded to a western QC 136. That could happen upon completion of reconstruction of the Turcot interchange with A-15/20, and part of existing A-720, which could be in 2019 or 2020.

The A-720 route file could use some recentering and perhaps truncation (an official map, and GMSV, suggest A-720 ends short of Pont Jacques-Cartier). But I would defer most changes until A-720 becomes QC 136, after all the reconstruction is completed and QC 136 perhaps gets a new endpoint. In the meantime, I'll synch A-720's waypoint 5 with the west end of A-10, and correct A-720's east end label to RueNotDame.

There are no intersections with highways in the canqc route set, so it will be unaffected until the new QC 136 is added to the system.
« Last Edit: September 30, 2018, 12:33:02 am by oscar »

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1581
  • Last Login:Today at 11:13:36 am
    • Hot Springs and Highways pages
Re: Quebec outlook
« Reply #1 on: November 20, 2020, 04:46:44 pm »
Plans have been approved for a northward extension of A-25 to Sainte-Julienne. Work is scheduled to begin in 2022.

Also, modernization work on the Turcot interchange (A-15/A-20/A-720/new QC 136 segment) in Montreal is nearing completion, with the bulk of the construction to be done the rest of this year, and finish-up work continuing into 2021. 

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1581
  • Last Login:Today at 11:13:36 am
    • Hot Springs and Highways pages
Re: Quebec outlook
« Reply #2 on: March 13, 2021, 01:58:29 pm »
A reminder to self about a recent route change: When Autoroute 410 was extended around Drummondville in Dec. 2020, signage unveiled at the opening ceremony indicates QC 108 was rerouted onto A-410, with the old alignment (part of Rue College) east of QC 143 becoming a truck-restricted local road. While OSM reflects the change, Transports Quebec's online mapping doesn't.

Once the US-Canada border reopens to non-essential travel (not holding my breath on that), I can field-check this as part of re-clinching A-410.

Offline froggie

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 855
  • Last Login:Today at 06:58:40 am
Re: Quebec outlook
« Reply #3 on: March 14, 2021, 11:33:19 pm »
^ I can potentially field-check that as well, considering I'm in a better (i.e. 90 minute drive) position to do so.

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1581
  • Last Login:Today at 11:13:36 am
    • Hot Springs and Highways pages
Re: Quebec outlook
« Reply #4 on: October 05, 2021, 02:53:00 am »
^ I did the A-410 field-check a few days ago (also, the A-85 extension SE of Riviere-du-Loup, already added to the HB, and QC 382, also in the HB). Looks like QC 108 will need a short reroute, plus a label change on A-410's new east end, and tweaks on A-85 and maybe QC 382, when I get back home.

UPDATE: A-85 and related changes at https://github.com/TravelMapping/HighwayData/pull/5236

No changes to QC 108 or A-410, or QC 382. Some signage indicates that part of QC 108 was moved to A-410, but other signage at A-410(13) indicates QC 108 in Lennoxville is still north of that interchange (part concurrent with QC 143). Moreover, two different MTQ online maps say that QC 108 in Lennoxville hasn't moved at all. With inconsistent signage, I would use the online mapping as the tiebreaker.
« Last Edit: October 20, 2021, 05:59:41 pm by oscar »

Offline vdeane

  • Sr. Member
  • ****
  • Posts: 425
  • Gender: Female
  • Last Login:Today at 02:08:08 pm
    • New York State Roads
Re: Quebec outlook
« Reply #5 on: January 15, 2024, 03:39:24 pm »
Construction on the next phase of A-70 is underway.  Looks like it will open in 2028.

https://www.quebec.ca/transports/projets-routiers/saguenay-lac-saint-jean/autoroute-70-grande-anse-la-baie-construction
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

Offline LilianaUwU

  • :3
  • Newbie
  • *
  • Posts: 10
  • Gender: Female
  • Last Login:Today at 09:26:33 am
    • Twitter
Re: Quebec outlook
« Reply #6 on: September 17, 2024, 11:04:09 am »
Two more segments of A-85 have opened, which seems to extend the Rivière-du-Loup segment up to QC 291 at exit 60. Article in French: https://ici.radio-canada.ca/nouvelle/2104869/autoroute-85-nouveaux-troncons-temiscouata

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1581
  • Last Login:Today at 11:13:36 am
    • Hot Springs and Highways pages
Re: Quebec outlook
« Reply #7 on: September 17, 2024, 09:55:01 pm »
^ Thanx. I'm heading out of town (west, not northeast), but will watch for official press releases and other info to clarify some points in the CBC article, before I make any changes to A-85/QC 185.

Offline vdeane

  • Sr. Member
  • ****
  • Posts: 425
  • Gender: Female
  • Last Login:Today at 02:08:08 pm
    • New York State Roads
Re: Quebec outlook
« Reply #8 on: September 18, 2024, 07:25:36 am »
^ Thanx. I'm heading out of town (west, not northeast), but will watch for official press releases and other info to clarify some points in the CBC article, before I make any changes to A-85/QC 185.
MTQ made a post on Facebook about it, but I'm not sure how to directly link to it.

This link to their page should work without an account, at least long enough to scroll down to yesterday's post (just click the x to close their nag).

https://www.facebook.com/TransportsQc/
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.