Author Topic: OH OH55 Eastern Terminus  (Read 1088 times)

0 Members and 1 Guest are viewing this topic.

Offline gpw

  • Newbie
  • *
  • Posts: 12
  • Gender: Male
  • Last Login:March 05, 2024, 06:55:57 pm
OH OH55 Eastern Terminus
« on: July 04, 2021, 08:12:48 pm »
In the field (as of this afternoon), an END OH55 assembly appears at its junction with US68 about a mile south of the traffic circle in Urbana. The ODOT SLD for Champaign County confirms this. It appears that this concurrency was removed around 2013.

-GPW

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3097
  • Last Login:Today at 10:48:53 pm
Re: OH OH55 Eastern Terminus
« Reply #1 on: July 04, 2021, 08:20:58 pm »
This is confirmed in GSV.  The shaping points between OH 560 and US 68 should be considered to be replaced by visible points as well.

As I start exploring Ohio more, I am really starting to get annoyed at the number of Ohio routes that end concurrent with other routes.  There are quite a few that I had left out of my recent list file update due to uncertainties over whether these concurrencies exist.

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1640
  • Last Login:Today at 07:00:32 pm
Re: OH OH55 Eastern Terminus
« Reply #2 on: July 28, 2021, 04:22:19 pm »
Thanks for catching this. Looks like the end has been at that location for over a decade at least. https://github.com/TravelMapping/HighwayData/pull/4998
« Last Edit: July 28, 2021, 09:16:49 pm by mapcat »
Clinched:

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1640
  • Last Login:Today at 07:00:32 pm
Re: OH OH55 Eastern Terminus
« Reply #3 on: July 28, 2021, 10:40:32 pm »
Forgot to add US36 as an alt label for US68. It will be fixed in the next update.
Clinched: