Author Topic: AASHTO Fall 2017  (Read 5732 times)

0 Members and 2 Guests are viewing this topic.

Offline si404

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1948
  • Last Login:Today at 01:42:46 pm
AASHTO Fall 2017
« on: October 11, 2017, 10:21:55 am »
https://route.transportation.org/wp-content/uploads/sites/50/2017/06/USRN-01-Minutes-and-Application-results_-AM-Phoenix-2017.pdf
  • AR (Future?) I-57: establish (I-40 to US412)
  • AR US 71 Business (Waldron): recognise
  • AR US 64: relocate onto bypasses of Crawfordsville, Earle, Patterson-McCrory, Parkin, and Wynne
  • AR US 64 Business (Crawfordsville): recognise
  • AR US 64 Business (Earle): recognise
  • AR US 64 Business (Patterson and McCrory): recognise
  • AR US 64 Business (Parkin): recognise
  • AR US 64: Business (Wynne): recognise
  • FL US 319: Relocation: Between SR3O/US98 and Alaska Way 'to align with Wakulla School Road'.
  • KY I-165: 'Relocation' (establishment?) along William H. Natcher Parkway between Bowling Green and Owensboro.
  • NY I-895: Elimination (NYSDOT propose renumbering as NY895 after turning into arterial road.
  • NC I-840: Extension between I-73 and US 220 and between US 29 and US 70
« Last Edit: September 02, 2018, 11:45:46 am by michih »

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1524
  • Last Login:Today at 03:03:34 pm
    • Hot Springs and Highways pages
Re: AASHTO Fall 2017
« Reply #1 on: October 11, 2017, 11:52:04 am »
As noted over at the AARoads forum, most of the AR items appear to ratify decisions approved (and presumably carried out) by the state ages ago. One of them was approved more than six decades ago! So aside from the one item of genuinely new news (Future I-57), we may not need to do anything in AR.

Other major approvals: I-165 in KY, I-840 in NC, I-895 in New York => NY 895.

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4234
  • Last Login:February 13, 2024, 07:19:36 pm
  • I like C++
Re: AASHTO Fall 2017
« Reply #2 on: October 12, 2017, 03:13:07 am »
Waiting on signage to appear before moving forward on AR I-57.
No changes needed for the rest of the AR applications. Again.

I'll wait to see how things shake out for the Sheridan Expressway.

Other SCRN links, including maps & the like:
https://route.transportation.org/wp-content/uploads/sites/50/2017/06/USRN_04-2017_AM_USRN-USBR_Applications-AR-NY_Part_1.pdf
https://route.transportation.org/wp-content/uploads/sites/50/2017/06/USRN_04-2017_AM_USRN-USBR_Applications_NC-WV-_Part_2.pdf
« Last Edit: October 12, 2017, 03:15:17 am by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1627
  • Last Login:Today at 04:37:32 pm
Re: AASHTO Fall 2017
« Reply #3 on: October 13, 2017, 08:54:51 pm »
Also waiting for evidence of signage on I-165.
Clinched:

Offline dfilpus

  • Full Member
  • ***
  • Posts: 150
  • Gender: Male
  • Last Login:Today at 02:43:16 pm
    • Filpus Roadgeek
Re: AASHTO Fall 2017
« Reply #4 on: March 06, 2019, 06:08:40 pm »
Also waiting for evidence of signage on I-165.
I-165 signage started being installed today.
https://www.facebook.com/kytcdistrict3/posts/1255571527941792

Offline mvak36

  • Newbie
  • *
  • Posts: 41
  • Last Login:September 29, 2023, 09:36:33 am
Re: AASHTO Fall 2017
« Reply #5 on: June 11, 2019, 09:29:55 am »

I'll wait to see how things shake out for the Sheridan Expressway.


It looks like they started construction on it last year: https://www.bxtimes.com/stories/2018/40/40-sheridan-2018-10-05-bx.html.

Couldn't find much other information like how long the project is supposed to take.

EDIT: Found another site that says that it's supposed to be completed by the end of 2019. https://www.amny.com/news/sheridan-expressway-bike-path-1.21134764
« Last Edit: June 11, 2019, 09:34:01 am by mvak36 »

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4234
  • Last Login:February 13, 2024, 07:19:36 pm
  • I like C++
Re: AASHTO Fall 2017
« Reply #6 on: June 11, 2019, 12:31:07 pm »
Thanks for the heads-up.
Being too lazy to do more research at this very moment, were they going to redesignate it NY895?
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 05:53:28 pm
Re: AASHTO Fall 2017
« Reply #7 on: June 11, 2019, 03:54:58 pm »
Thanks for the heads-up.
Being too lazy to do more research at this very moment, were they going to redesignate it NY895?

Yes, see https://www.aaroads.com/forum/index.php?topic=15789.msg2343852#msg2343852

Offline vdeane

  • Sr. Member
  • ****
  • Posts: 387
  • Gender: Female
  • Last Login:Yesterday at 09:23:42 pm
    • New York State Roads
Re: AASHTO Fall 2017
« Reply #8 on: June 17, 2019, 01:47:53 pm »
Thanks for the heads-up.
Being too lazy to do more research at this very moment, were they going to redesignate it NY895?
Eventually, though I'm not sure when the signs will be switched.  I'm guessing when the at-grades open would be a good time to consider it switched.
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 05:53:28 pm
Re: AASHTO Fall 2017
« Reply #9 on: November 09, 2019, 10:10:31 pm »
The NY 895 change was done via the linked thread below.

http://forum.travelmapping.net/index.php?topic=3258.0

Offline dave1693

  • Full Member
  • ***
  • Posts: 185
  • Last Login:November 21, 2023, 11:28:54 pm
Re: AASHTO Fall 2017
« Reply #10 on: November 20, 2019, 03:16:16 pm »
Thanks for the heads-up.
Being too lazy to do more research at this very moment, were they going to redesignate it NY895?
Eventually, though I'm not sure when the signs will be switched.  I'm guessing when the at-grades open would be a good time to consider it switched.
I just drove all of NY 895 on November 3rd -- actually, I was riding shotgun and trying to navigate after we missed an exit. The entire highway was (and presumably still is, given its status 2 weeks ago) still under construction, and the at-grade intersections were, shall we say, sporadic, as in most of them were not open to traffic.

Signage-wise, it's clear that while NYSDOT considers the changeover to NY 895 a done deal, the priority was to replace the most relevant BGSs. Some of the smaller signs (MGS?) with directions on them still have I-895 shields and don't look likely to be replaced any time soon, and all the standalone shields I saw still are I-895 shields. I consider it wise not to have held our breath waiting for signage to change.

Offline vdeane

  • Sr. Member
  • ****
  • Posts: 387
  • Gender: Female
  • Last Login:Yesterday at 09:23:42 pm
    • New York State Roads
Re: AASHTO Fall 2017
« Reply #11 on: November 23, 2019, 04:02:15 pm »
Except the signage did change.  Specifically, as you noted, the main BGS signs.  Actually, if the at-grades are still not open (note that they won't allow turns to/from NY 895 as far as I know, just crossing), I'm surprised the signage changed already; normally that happens towards the end of a project, not the middle.
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

Offline compdude787

  • TM Collaborator
  • Sr. Member
  • *****
  • Posts: 298
  • Gender: Male
  • Last Login:February 09, 2024, 02:19:30 am
Re: AASHTO Fall 2017
« Reply #12 on: December 28, 2020, 05:50:04 pm »
This is from three years ago... Surely all these changes have been made already, right?

Just trying to cut down on all the numerous threads we have in this part of the forum.

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 05:53:28 pm
Re: AASHTO Fall 2017
« Reply #13 on: December 28, 2020, 06:19:29 pm »
I-840 has not been completed yet, and it still will not be fully done until 2022 at the earliest.

Offline compdude787

  • TM Collaborator
  • Sr. Member
  • *****
  • Posts: 298
  • Gender: Male
  • Last Login:February 09, 2024, 02:19:30 am
Re: AASHTO Fall 2017
« Reply #14 on: December 28, 2020, 06:25:12 pm »
I-840 has not been completed yet, and it still will not be fully done until 2022 at the earliest.

Yes, but the extensions that were approved have already been opened.