Author Topic: ND: Killdeer Bypass now open!  (Read 3654 times)

0 Members and 1 Guest are viewing this topic.

Offline the_spui_ninja

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 721
  • Last Login:Yesterday at 01:38:28 pm
  • THE Western SD Highway Nut
ND: Killdeer Bypass now open!
« on: November 01, 2016, 11:35:24 am »
See http://tm.teresco.org/forum/index.php?topic=74.0 for previous info.

This would entail switching ND 22 over to the bypass and designating the old route as either ND 22B or ND 22 Business (depending on signage)
An adventure is only an inconvenience rightly considered. An inconvenience is only an adventure wrongly considered. - G.K. Chesterton

Offline the_spui_ninja

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 721
  • Last Login:Yesterday at 01:38:28 pm
  • THE Western SD Highway Nut
Re: ND: Killdeer Bypass now open!
« Reply #1 on: January 19, 2017, 11:05:37 am »
Does this look like ND 22 Business to anyone (it kinda does, but the camera is too low-resolution)?


This is looking north into Killdeer along ND 22B.
« Last Edit: January 27, 2017, 02:18:44 pm by the_spui_ninja »
An adventure is only an inconvenience rightly considered. An inconvenience is only an adventure wrongly considered. - G.K. Chesterton

Online Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2732
  • Last Login:Today at 10:27:44 am
Re: ND: Killdeer Bypass now open!
« Reply #2 on: February 21, 2017, 08:58:09 pm »
I have attached some files @the_spui_ninja emailed to me that would add this.  Anyone willing to take a look, make any needed fixes (including csv changes and updates entry/ies) and make a pull request?

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1524
  • Last Login:Today at 09:24:33 am
    • Hot Springs and Highways pages
Re: ND: Killdeer Bypass now open!
« Reply #3 on: February 21, 2017, 11:25:06 pm »
I've downloaded the files, and will work on this tomorrow.

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4234
  • Last Login:February 13, 2024, 07:19:36 pm
  • I like C++
Re: ND: Killdeer Bypass now open!
« Reply #4 on: February 23, 2017, 01:28:03 am »
It's confirmed as ND22Bus rather than ND22B, then?
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1524
  • Last Login:Today at 09:24:33 am
    • Hot Springs and Highways pages
Re: ND: Killdeer Bypass now open!
« Reply #5 on: February 23, 2017, 11:21:55 am »
"B" could be either Business or Bypass. My guess is that here it would be "Business:". If it were a new route, rather than a redesignation of the old alignment, I'd put it down as "Bypass", as we did with US 85B in Williston.

Still unclear whether 22B is signed, as such or as Business ND 22. Just to keep the bypassed mileage in our system, I'd err on the side of leaving it in as Business ND 22, which we can fix later if we find it has no route signage.
« Last Edit: February 23, 2017, 11:27:13 am by oscar »

Offline the_spui_ninja

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 721
  • Last Login:Yesterday at 01:38:28 pm
  • THE Western SD Highway Nut
Re: ND: Killdeer Bypass now open!
« Reply #6 on: February 23, 2017, 11:42:42 am »
It's confirmed as ND22Bus rather than ND22B, then?
It looks like from the traffic cameras that the signs aren't "ND 22B", and it wouldn't make sense for it to be a bypass.
An adventure is only an inconvenience rightly considered. An inconvenience is only an adventure wrongly considered. - G.K. Chesterton

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1524
  • Last Login:Today at 09:24:33 am
    • Hot Springs and Highways pages
Re: ND: Killdeer Bypass now open!
« Reply #7 on: February 24, 2017, 08:31:46 pm »
Pull request submitted. Only changes to the_spui_ninja's files were to add nd. prefix to filenames, and point relabel in one file.

Online Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2732
  • Last Login:Today at 10:27:44 am
Re: ND: Killdeer Bypass now open!
« Reply #8 on: February 24, 2017, 09:49:46 pm »
And it's in the site update currently in progress.  Should be live on site in about 30 minutes.

Offline the_spui_ninja

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 721
  • Last Login:Yesterday at 01:38:28 pm
  • THE Western SD Highway Nut
Re: ND: Killdeer Bypass now open!
« Reply #9 on: February 27, 2017, 02:09:20 pm »
Everything looks alright; isn't the format for naming ND22/22Bus instead of ND22.22Bus?
An adventure is only an inconvenience rightly considered. An inconvenience is only an adventure wrongly considered. - G.K. Chesterton

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1524
  • Last Login:Today at 09:24:33 am
    • Hot Springs and Highways pages
Re: ND: Killdeer Bypass now open!
« Reply #10 on: February 27, 2017, 03:54:37 pm »
Everything looks alright; isn't the format for naming ND22/22Bus instead of ND22.22Bus?

Yep. I'll get that typo fixed once my eyes are more awake.

The typo was one of the hazards of trying to get a little work done here only a week after eye surgery.

EDIT: Correction now in the HB.
« Last Edit: February 28, 2017, 07:46:06 am by oscar »