DE: US 9 TRUCK (Georgetown) Realignment
« on: December 04, 2023, 02:05:01 pm »
The US 9 TRUCK Route realignment in Georgetown apparently opened in September, and I just now found out about it.

I think I am going to field check this on December 15th.  I believe I need to clarify signage (most specifically for DE 404 TRUCK because I have debated on whether that should even be in the HB) before implementing this.

Offline Duke87

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 969
  • Last Login:Yesterday at 08:10:56 pm
Re: DE: US 9 TRUCK (Georgetown) Realignment
« Reply #1 on: December 05, 2023, 01:50:43 am »
September 2023 streetview shows some construction at a state where there's no way it's done yet. But that's the realignment of Park Ave to make room for the runway 4/22 extension at GED. Realignment off of South Bedford and onto Arrow Safety logically goes along with this but also needn't necessarily wait since Arrow Safety already exists.

Personally I'd do nothing yet and just make the whole change at once when the realignment of Park opens, since from a full-project perspective this is clearly still a work in progress.


Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3146
  • Last Login:Today at 07:58:04 am
Re: DE: US 9 TRUCK (Georgetown) Realignment
« Reply #2 on: December 05, 2023, 06:34:02 am »
https://deldot.gov/public.ejs?command=PublicProjectPortalDocument&iDID=1264125&iProjectObjectID=54769

I agree on a no-build for now since I relooked at the Project Website and see that the Park Ave Realignment is part of this.

I may forego the field check then because I was not really into forcing myself onto the Eastern Shore just for that.
« Last Edit: December 05, 2023, 10:01:31 am by Markkos1992 »

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3146
  • Last Login:Today at 07:58:04 am
Re: DE: US 9 TRUCK (Georgetown) Realignment
« Reply #3 on: May 02, 2024, 06:19:10 pm »
« Last Edit: May 13, 2024, 07:55:14 pm by Markkos1992 »

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3146
  • Last Login:Today at 07:58:04 am
Re: DE: US 9 TRUCK (Georgetown) Realignment
« Reply #4 on: Yesterday at 05:36:59 pm »
(For US 9 TRUCK (Georgetown))  Sussex County - Park Avenue Phase 1 in Georgetown now open to traffic

Map:  https://deldot.gov/public.ejs?command=PublicProjectPortalDocument&iDID=2008248&iProjectObjectID=54769

I will have a closure point at the east end of the realignment.  (https://www.delawareonline.com/story/news/2021/09/08/construction-georgetowns-park-ave-relocation-begin-next-year/5753846001/)

Quote
The western portion of the existing Park Avenue will become a cul-de-sac, ending at the railroad tracks on the western side of the airport, according to Lawson. Another cul-de-sac will be constructed on the other side of the tracks, for use until construction is complete, at which point that portion of the road will be abandoned and eventually removed.

https://github.com/TravelMapping/HighwayData/pull/7427
« Last Edit: Yesterday at 07:05:03 pm by Markkos1992 »

Offline froggie

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 810
  • Last Login:Yesterday at 07:01:34 pm
Re: DE: US 9 TRUCK (Georgetown) Realignment
« Reply #5 on: Yesterday at 06:59:23 pm »
^ The first two links are to the same URL.

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3146
  • Last Login:Today at 07:58:04 am
Re: DE: US 9 TRUCK (Georgetown) Realignment
« Reply #6 on: Yesterday at 07:05:56 pm »
^ The first two links are to the same URL.


Fixed now.