Title: KY: KY 15/KY 80 New Interchange At Morton Blvd
Post by: Markkos1992 on April 13, 2021, 10:39:16 am
The interchange may not be open yet, but it is practically built, and the point location seems distinguishable on the HERE Maps.

https://www.aaroads.com/forum/index.php?topic=4489.msg2595811#msg2595811

EDIT: Based on H.B.'s response in the forum, a point should be added on KY 15 at Perry Park Rd as well.

Quote
They're also turning the currently-signalized intersection at Perry Park Road into a grade-separated interchange.
Title: Re: KY: KY 15/KY 80 New Interchange At Morton Blvd
Post by: mapcat on April 15, 2021, 08:04:23 pm
Okay, I found the plans on the KYTC District 10 site, but there's no updated imagery yet. Morton Blvd isn't a problem, but the highway is being realigned at KY 550 and Perry Park, and it's unclear if it's moved to the new alignment yet (I was there last fall and believe that traffic was still using the old alignment while the new bridge was under construction). See if you can find out how the realignment is progressing, and if traffic has moved, whether the new GSJ is open yet.
Title: Re: KY: KY 15/KY 80 New Interchange At Morton Blvd
Post by: Markkos1992 on April 16, 2021, 07:17:59 pm
It looks like it should be completed sometime this year (https://www.aaroads.com/forum/index.php?topic=4489.msg2597846#msg2597846).
Title: Re: KY: KY 15/KY 80 New Interchange At Morton Blvd
Post by: mapcat on April 16, 2021, 07:23:43 pm
Okay, if you happen to notice an update let me know and I will add it.
Title: Re: KY: KY 15/KY 80 New Interchange At Morton Blvd
Post by: Markkos1992 on November 21, 2021, 11:47:26 am
The KYTC District 10 Facebook Page states that this project is substantially complete as of November 9, 2021. (https://www.facebook.com/hashtag/ky15project)

Title: Re: KY: KY 15/KY 80 New Interchange At Morton Blvd
Post by: mapcat on November 22, 2021, 02:52:26 pm
I'm planning a trip down there in the near future and will see what all needs to change at the interchange and north of it where 15 has been widened.
Title: Re: KY: KY 15/KY 80 New Interchange At Morton Blvd
Post by: mapcat on November 30, 2021, 09:18:07 pm
https://github.com/TravelMapping/HighwayData/pull/5381


Point added for Morton Blvd, and KY 267 junction split into two at access roads (the new segment below the bridge is not KYTC-maintained, so I'm following the KYTC maps showing the route with a short concurrency with 15). No other points appeared to need adjusting.
Title: Re: KY: KY 15/KY 80 New Interchange At Morton Blvd
Post by: Markkos1992 on December 01, 2021, 07:20:42 am
The MorBlvd point does need to be added to KY 80 as that has caused a broken concurrency.  I wanted to clarify that this was the case before posting it.
Title: Re: KY: KY 15/KY 80 New Interchange At Morton Blvd
Post by: mapcat on December 01, 2021, 09:25:21 am
Fixed in my local copy.