Author Topic: IA: a couple IA1 issues  (Read 1400 times)

0 Members and 1 Guest are viewing this topic.

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4234
  • Last Login:February 13, 2024, 07:19:36 pm
  • I like C++
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline Highway63

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 528
  • Gender: Female
  • Last Login:February 16, 2024, 01:40:37 am
Re: IA: a couple IA1 issues
« Reply #1 on: January 05, 2021, 12:33:40 am »
I don't know how I entered the US 30 bypass without adding a point on the file for IA 1. Oversight on my part.

(Which reminds me: The bypass four-lane link was supposed to be finished at the west end, but I never got over there to check it out.)

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 02:53:08 pm
Re: IA: a couple IA1 issues
« Reply #2 on: February 16, 2021, 07:34:52 pm »
Note that IA 1 will be affected by the addition of US 30 BUS in Lisbon/Mt Vernon.

Offline SSOWorld

  • Full Member
  • ***
  • Posts: 222
  • Last Login:Yesterday at 09:35:08 pm
Re: IA: a couple IA1 issues
« Reply #3 on: February 17, 2021, 04:02:14 am »
I don't know how I entered the US 30 bypass without adding a point on the file for IA 1. Oversight on my part.

(Which reminds me: The bypass four-lane link was supposed to be finished at the west end, but I never got over there to check it out.)
Finished at the east end (drove it in late Dec.)
Completed:
* Systems: DC, WI
* by US State: AR: I&; AZ: I; DE: I; DC: I, US, DC; IL: I; IN: I*; IA: I, KS: I; MD: I, MA: I, MI: I; MN: I; MO: I*; NE: I; NJ, I; OH: I; RI: I; SD: I; WA: I; WV: I; WI: I,US,WI; (AR, IN pending expansions.)

*Previously completed

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1627
  • Last Login:Today at 10:09:32 am
Re: IA: a couple IA1 issues
« Reply #4 on: May 12, 2021, 10:22:47 am »
I passed through the area last week and Bus 30 is still not signed from the bypass, or on what I supposed was the business route (IA 1, Lincoln Hwy/Kirkwood Blvd, Lisbon Blvd). Lincoln Hwy still had some plain US 30 signs at the IA 1 roundabout.
Clinched:

Offline Highway63

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 528
  • Gender: Female
  • Last Login:February 16, 2024, 01:40:37 am
Re: IA: a couple IA1 issues
« Reply #5 on: May 15, 2021, 03:13:20 pm »
1. There was no agreement to make the old route a business route.

2. Has the west connection been completed so that both directions have two lanes of traffic from US 151 to the east end of the bypass?

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1627
  • Last Login:Today at 10:09:32 am
Re: IA: a couple IA1 issues
« Reply #6 on: May 16, 2021, 12:22:53 pm »
I went both directions and don't recall anything appearing unfinished.
Clinched: