Highway Data Discussion > Updates to Highway Data
AASHTO SCOH USRN Spring 2021
yakra:
AR US70 Little Rock has its own thread somewhere.
AR US412 Bypass/Business Paragould is already in the HB.
FL US301 Establishment of a U.S. Alternate Route between US-301/SR-200 and US-301/SR-200
FL US301 Establishment of a U.S. Alternate Route between I-10/SR-8 and US-301/SR-200
IL I-74/US6 between 7th Ave. in Moline, IL and Grant St. in Bettendorf, IA
IN I-69Whe between South of ST 39/SR37 interchange in Morgan County and North of SR 44 intersection
IA I-74/US6 between Illinois-Iowa Border and US67 Grant Street Interchange in Bettendorf
KY US68 Relocation of U.S. (Interstate) Route and Recognition of a Business Route on U.S. (Interstate) Route between Paris and Carlisle
MI I-375 Elimination of a U.S. (Interstate) Route between I-75 and Jefferson Ave.
NY US9 nothing to change because 1PPI @ I-787(4)
NY I-81 / I-81BL / I-481
NC I-587 Establishment of a U.S. (Interstate) Route between I-95 in Wilson County and US 264 in Greenville (Pitt County)
NC US64 relocation/business Asheboro already in HB?
SD US18 Hot Springs
SD US385 looks like it was just a change to a description of a concurrency, not a change to the route itself, with AASHTO being like LOLKSURE. US385 will need new waypoint labels. :P
rickmastfan67:
--- Quote from: yakra on August 10, 2021, 01:25:50 am ---FL US301 Establishment of a U.S. Alternate Route between US-301/SR-200 and US-301/SR-200
FL US301 Establishment of a U.S. Alternate Route between I-10/SR-8 and US-301/SR-200
--- End quote ---
As far as I can tell, those are the two new US-301 bannered routes I've recently added, so I would have to say FL is already done here.
The only thing is that the 2nd one (Baldwin) is really posted as a Bypass, and not an Alternate route.
Markkos1992:
I'll look further at these later, but most of these seem to already be covered.
si404:
There is indeed, very little to do here at the moment. Needs clarification, change at some point in the future, already done
[*]AR US70 - swapped from getting from Interstates to SW of Little Rock to campus from University to Stagecoach. wait until signed. Browser has US70 on interstates and this as US70B
[*]AR US412 / US412Bus - Paragould bypass / old road
[*]FL US301Alt - two new Alternate routes, bypassing Starke and Baldwin
[*]IL/IA I-74/US6 (Contingent on FHWA approval) - I-74/US6 relocated onto replacement bridge. Minor point adjustment in both states when construction complete
[*]IN I-69 (Contingent on FHWA approval) - Extension through Martinsville. Extend when construction finished
[*]KY US68 - Relocations between Paris and Carlisle over new alignment with business route along old route through Millersburg
[*]MI I-375 (Contingent on FHWA approval) - Eliminated in its entirety in 2027 (or sooner) when the freeway closes. Wait until then (MDOT getting the paperwork done early)
[*]NY US9 - Northbound route moves onto surface streets instead of using ramp that's being rebuilt as a High Line-style path/park. (No change as 1PPI)
[*]NY I-81/I-81BL/I-481 (Contingent on FHWA approval) - Renumbering I-481 as part of I-81. Old route of I-81 becomes I-81BL. Wait until it happens in Spring 2027
[*]NC I-587 (FHWA approval granted) - New interstate from I-95 to US264. Add when signed? Or add as unsigned interstate?
[*]NC US64/US64Bus - Relocation of US64 onto Asheboro bypass and establishment of business loop on old route.
[*]SD US18 / US18Byp - US18Trk at Hot Springs becomes vanilla US18, old route not US18. Do when signs changed[/list]
mapcat:
The US68 relocation in KY is already live. The only place I've ever seen business route signage is on the old route through Millersburg, which hasn't changed since 2018.
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version