Travel Mapping
Highway Data Discussion => Updates to Highway Data => Solved Highway data updates => Topic started by: michih on November 10, 2019, 02:35:34 am
-
We currently have a section of 2.54mi only: http://travelmapping.net/hb/index.php?r=hun.m004
There is another section at Cegled (partially?) signed as M4. I only have incomplete info about the exit numbers.
This section should be extended by 30km at west end and 20km at east end this December. I think it's possible that even the existing section to Budapest airport will be signed as M4 - to be checked.
Side note: And the M4 section in HB should be extended by 26km up to the Romania border in January.
-
We currently have a section of 2.54mi only: http://travelmapping.net/hb/index.php?r=hun.m004
There is another section at Cegled (partially?) signed as M4. I only have incomplete info about the exit numbers.
This section should be extended by 30km at west end and 20km at east end this December. I think it's possible that even the existing section to Budapest airport will be signed as M4 - to be checked.
Side note: And the M4 section in HB should be extended by 26km up to the Romania border in January.
Probably irrelevant for TM purposes, but it's not the Budapest airport, rather, it's the Liszt Ferenc (Franz Liszt) Airport (I think the airport code is BUD though!).
-
It's 'Budapest Liszt Ferenc Nemzetközi Repülőtér' (Budapest Ferenc Liszt International Airport) and called 'Ferihegy' by locals as that's the place it is in Budapest, and the pre-2011 disambiguation with smaller airfields around the city. The code is indeed BUD, but Budapest has always been in the name.
But this is off-topic, as the point name on F4 for the airport is a road name.
-
LOL I also thought about it when writing the post. I had "Budapest Airport" first and changed it to "Budapest airport" because it's not the correct name :)
-
There is another section at Cegled (partially?) signed as M4. I only have incomplete info about the exit numbers.
This section should be extended by 30km at west end and 20km at east end this December. I think it's possible that even the existing section to Budapest airport will be signed as M4 - to be checked.
Side note: And the M4 section in HB should be extended by 26km up to the Romania border in January.
Delayed with new deadlines in February, June and July 2020 :(
-
The first section is in service now, pics with exit numbers: https://www.skyscrapercity.com/showpost.php?p=166318204&postcount=8898