Highway Data Discussion > Solved Highway data updates

NC: US 74 (Shelby to Rockingham and NC130_W)

<< < (2/2)

Markkos1992:

--- Quote from: mapmikey on April 29, 2021, 07:39:13 pm ---All intended changes made except the I-277 at NC 16 thing.

My intended solution is to split it into 2 points:

Stonewall St (point on the overpass) - note there are 3 of the 4 movements from I-277 to it but it so happens the only off ramp is part of the 2A exit ramp
Move the 2A point to the center of the NC 16 couplet

--- End quote ---

I am fine with this solution.  It seems to be the best option here.


--- Quote ---9.  A point could be added at Boogan Cut Rd (BooCutRd) for shaping purposes.
--- End quote ---

An oops on my end.  This should have been Boggan Cut Rd (BogCutRd).


--- Quote ---Based on the below post from Bob Malme, a point should also be added on US 74 and US 76 at Chauncey Town Rd (ChaTownRd).
--- End quote ---

This point is still needed on US 76 (with all of those Wilmington revisions).

mapmikey:
corrections made plus I-277 solution implemented

Markkos1992:
A point should also be added on US 74 and NC 130 at Old Boardman Rd/Macedonia Church Rd due to a new interchange that is about to start construction.

https://www.aaroads.com/forum/index.php?topic=18.msg2607588#msg2607588

mapmikey:
point added in anticipation of the interchange

Navigation

[0] Message Index

[*] Previous page

Go to full version