Travel Mapping
Highway Data Discussion => Updates to Highway Data => Solved Highway data updates => Topic started by: Markkos1992 on May 01, 2022, 03:35:40 pm
-
Should there be a second point (labeled 215A) for the Parham Rd interchange? I do not think this fits into the half-interchange rule as the Parham Rd interchange is a 3/4 diamond.
I am indifferent on whether a point is added at Parham Rd on US 1 BUS (Henderson)/US 158.
-
To my eyes it's a single interchange, an unusually laid-out diamond with 1 extra SB onramp. YMMV.
Agnostic on where to center its point; as-is looks good enough.
-
Given that 2 exits over there is the exact same set-up and it has 2 distinct exits and the connecting road had a point, too, I have changed exit 215 to the same...
In the queue
-
It looks like the ParRd point was not added to US 1 BUS creating a broken concurrency with US 158. Also SatPoiRd on both routes to the east could use a slight relocation.
-
I see what I did here. Added it when making Exit 215 related changes. Then forgot I had done so when getting to the US 1 Bus Hen item on the long thread later and I downloaded the file from Github again instead of calling back up my local copy here at home.
Corrected and in the queue.