21
In-progress Highway Systems & Work / Re: blzar+blzd: Belize Roads
« Last post by michih on Today at 12:28:26 am »Changes were online so that I could prepare the files for activation. System will be active with the next site update.
If you have any trouble registering for the forum, please email travmap@teresco.org for help.
As far as I am concerned you can activate these 2 systems. Having me as maintainer is fine.
Adding the next round here for now since these have not ben sent in yet, and these are all in western SC.
US 123:
1. Consider replacing the shaping point east of GA/SC with a visible point at Hopewell Church Rd (HopChuRd).
2. PumpHouRd should be PicRd or WelRd.
3. Consider replacing the shaping point west of US76_W with a visible point.
4. OldPenRd>-PenRd. (also affects US 76 and SC 28, no evidence that this is part of SC 93 now)
5. US123Con>-RossAve (also affects nearby SC 93)
6. Should a point be added for this slip ramp to Broad St?
US 276:
1. US29Spr>-ColSt. US29Con>-WadeHamBlvd.
2. RutSt>-RutSt_S
3. FurUniv>-FurUni?
4. Consider replacing the shaping point west of SC8 with a visible point.
5. Maybe add a point here for Caesars Head State Park. Also consider other trailheads/overlooks if needed for shaping purposes.
The fact that Virginia sometimes leaves postings up is irrelevant to me...if the CTB decommissions the route it should come off of TM.