Highway Data Discussion > 6-Month+ Highway Data Outlook

Alberta outlook

<< < (2/3) > >>

yakra:
Recent: Alberta openings #4194
• AB43 relocated onto AB43X
• AB201 (Woodbine) opened
• AB201SCa extended, 5->9
• AB201 (Signal Hill) added

Watchlist

Check signage / GMSV
ItemImagery    RetrievedOld AB453, Grande Prairie(pre-2019)(before 2020-09-24)AB201SCa/22X: Exit 6 really 7?U/C2021-05-10)
ToDo:
AB28/651 jct
AB28/38 jct
AB63 N terminus
CSVs into credits.php
routings/termini from CSVs

2020
end of this year: AB201 exits 9-13 (This is contradicted by every other source I've seen)

2021
Before summer? Fall Tofield bypass
10/01: AB201 exits 9-13
Fall? Tofield bypass

2023
Fall: AB2 interchange @ 40th Avenue, Airdrie

2024-10-01: AB201 north of Hwy 8 to Exit 36
When? AB201 along AB8 from Exit 22, I'd expect at that same time or maybe sooner if it gets upgraded along the way.

yakra:

--- Quote from: https://calgaryherald.com/news/local-news/final-sections-of-southwest-portion-of-calgary-ring-road-set-to-open-this-weekend ---The final stretch of the southwest Calgary ring road is scheduled to open Saturday.

A member of the project team said the last sections of the road stretching from Fish Creek Boulevard to Highway 22X is scheduled to open at 4 p.m., although the provincial government would not confirm the opening, saying there will be an announcement about the section “shortly.”

--- End quote ---

--- Quote ---The west portion of the ring road is scheduled to be completed in 2023, the South Bow River Bridge project is scheduled to be complete in 2023 and the northeast Stoney Trail widening project is scheduled to be finished later this year.

--- End quote ---

yakra:
Done
#5179 merge AB201SCa into AB201SWC
#5612 Tofield bypass

Watchlist

Check signage / GMSV
ItemImagery    RetrievedOld AB43, Grande PrairieJul 20222022-11-05
2023
Summer: AB201 @ 11 St NE
Fall: AB2 interchange @ 40th Avenue, Airdrie

2024
10-01: West Calgary Ring Road

yakra:
Done
#6880 AB201 extended to exit 32

Watchlist

Check signage / GMSV
ItemImagery    RetrievedOld AB43, Grande PrairieJul 20222022-11-05
2023
10-13: AB2 interchange @ 40th Avenue, Airdrie (confirm exit number)
Fall: AB201 @ 11 St NE

2024
10-01: West Calgary Ring Road

2025
Fall: AB1A/22

2026
Yellowhead Trail Freeway Conversion

yakra:
Done
AB2 interchange @ 40th Avenue, Airdrie
West Calgary Ring Road

Watchlist

Check signage / GMSV
ItemImagery    RetrievedOld AB43, Grande PrairieJul 20222022-11-05
2023
Fall: AB201 @ 11 St NE (confirm)

2026
Summer: AB3 twinning, Taber to Burdett (phase 1/8)
Yellowhead Trail Freeway Conversion
AB1A/22

When?
AB2 TR210 interchange

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version