Highway Data Discussion > 6-Month+ Highway Data Outlook

TN: TN 255 at Nashville Int'l Airport

(1/1)

Markkos1992:
It looks like the point at the airport is "just a bit outside" for some reason probably due to airport construction at some point.

mapcat:
The construction is ongoing, so once the relocated interchange with I-40 opens, I'll redraw everything between the taxiway overpasses and the end of the project just north of the existing interchange.

Navigation

[0] Message Index

Go to full version