Highway Data Discussion > Solved Highway data updates

UT 154: New Interchange at 6200S

(1/2) > >>

Markkos1992:
https://www.aaroads.com/forum/index.php?topic=20323.msg2652062#msg2652062

You could add the point now if you so desire.

US 89:
The same project is adding interchanges at 10400 South and 12600 South. Those are state highway junctions so they have TM waypoints already, but they’ll be getting new exit numbers once they’re done.

In fact, almost all of the remaining at-grades on Bangerter will be converted to interchanges in the next 10 years or so: https://www.bangerterprojects.com/schedule

Duke87:
Assuming the interchange will be numbered, I'm holding off on adding the point until it opens so I don't have to relabel it.

US 89:
Given that it is exactly halfway between two existing interchanges at 7000 South (exit 14) and 5400 South (exit 16), I’d say it’s a pretty safe bet this will be exit 15...

Duke87:

--- Quote from: US 89 on September 07, 2021, 01:30:24 am ---Given that it is exactly halfway between two existing interchanges at 7000 South (exit 14) and 5400 South (exit 16), I’d say it’s a pretty safe bet this will be exit 15...

--- End quote ---

Fair enough, but I still am not supposed to label it "15" if it isn't yet signed as such!