Author Topic: NC: NC 74 (Future I-74) Opening Between US 421 and US 158  (Read 2588 times)

0 Members and 1 Guest are viewing this topic.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 08:37:39 am
NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« on: August 31, 2020, 04:14:41 pm »
According to the AARoadsForum, this should open this week (https://www.aaroads.com/forum/index.php?topic=18.msg2529859#msg2529859).

Also I want to thank MalmeRoads.net for making it easy to identify the temporary NC 74 designation.

Offline mapmikey

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1171
  • Last Login:Today at 06:18:24 am
    • Co-curator Virginia Highways Project
Re: NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« Reply #1 on: August 31, 2020, 09:05:04 pm »
are we still adding new future interstate segments to TM?

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1829
  • Gender: Male
  • Last Login:Today at 06:11:34 am
Re: NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« Reply #2 on: September 01, 2020, 12:11:31 am »
are we still adding new future interstate segments to TM?

I don't think so.  Unless they directly connect to another 'Future' segment of said route already in the HB and can be added to that part.
« Last Edit: September 01, 2020, 12:15:03 am by rickmastfan67 »

Online Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2732
  • Last Login:Today at 08:47:31 am
Re: NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« Reply #3 on: September 01, 2020, 09:05:09 am »
To me, they're mostly useless from a TM point of view.  They're mostly (almost all?) concurrent with routes in other active systems.  The minor benefits I can see are that they let the route be all drafted and ready to be flipped into usai when they become genuine interstates, and they let users add list entries for the usaif routes that instantly give them the new mileage in usai when the routes move there (via AltRouteNames).

Is there any support at this time for removing the usaif system from TM?

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 08:37:39 am
Re: NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« Reply #4 on: September 01, 2020, 12:33:07 pm »
I am unsure if this debate is relevant here.  My understanding is that for now it will be signed as NC 74 then changed to I-74 when it extends to I-40.

Having said that, I would think that the NC 74 designation would make the Future I-74 designation unnecessary in this instance anyway.

Offline mapmikey

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1171
  • Last Login:Today at 06:18:24 am
    • Co-curator Virginia Highways Project
Re: NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« Reply #5 on: September 01, 2020, 09:03:07 pm »
NC 74 file created and submitted...

Offline dfilpus

  • Full Member
  • ***
  • Posts: 150
  • Gender: Male
  • Last Login:Today at 08:14:19 am
    • Filpus Roadgeek
Re: NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« Reply #6 on: September 02, 2020, 07:39:44 am »
NC 74 file created and submitted...
NC 74 is showing up in Updates, but the route itself is not found.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1829
  • Gender: Male
  • Last Login:Today at 06:11:34 am
Re: NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« Reply #7 on: September 02, 2020, 08:15:14 am »
NC 74 file created and submitted...
NC 74 is showing up in Updates, but the route itself is not found.

Seems the 'usanc' files weren't updated to include the new route, as the file itself is on the site.

I've pushed a fix for that.  Jim, could you pull that in this morning?
https://github.com/TravelMapping/HighwayData/pull/4153
« Last Edit: September 02, 2020, 08:17:18 am by rickmastfan67 »

Offline mapmikey

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1171
  • Last Login:Today at 06:18:24 am
    • Co-curator Virginia Highways Project
Re: NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« Reply #8 on: September 02, 2020, 08:21:02 am »
that is odd as I sent updated usanc and usanc_con files with my submission

Online Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2732
  • Last Login:Today at 08:47:31 am
Re: NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« Reply #9 on: September 02, 2020, 08:34:20 am »
Looks like I forgot to move the CSVs into place.  I'll use the ones mapmikey sent and run a site update.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 08:37:39 am
Re: NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« Reply #10 on: September 02, 2020, 10:11:56 am »
A point also needs to be added for 226 for I-40 BL (Winston-Salem) unless we are fine with deleting that route now.

EDIT: Unrelated, but a point should also be added on US 158 at Old Greensboro Rd based on this signage.
« Last Edit: September 02, 2020, 10:22:49 am by Markkos1992 »

Offline mapmikey

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1171
  • Last Login:Today at 06:18:24 am
    • Co-curator Virginia Highways Project
Re: NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« Reply #11 on: September 02, 2020, 10:29:32 am »
A point also needs to be added for 226 for I-40 BL (Winston-Salem) unless we are fine with deleting that route now.

Anyone know if it is still posted?  GMSV from Sept 2019 shows it is.

NCDOT takes forever to de-post stuff.  Still awaiting on US 311 depost confirmation from somewhere plus the US 70 major reroute...

Online Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2732
  • Last Login:Today at 08:47:31 am
Re: NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« Reply #12 on: September 02, 2020, 11:05:47 am »
Sorry about the failed site update with the NC 74 csv update.  I launched it and didn't pay attention.  Looks like the header line was erroneously deleted from the usanc_con.csv file.  Fixing and re-running.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1829
  • Gender: Male
  • Last Login:Today at 06:11:34 am
Re: NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« Reply #13 on: September 02, 2020, 11:15:32 am »
Sorry about the failed site update with the NC 74 csv update.  I launched it and didn't pay attention.  Looks like the header line was erroneously deleted from the usanc_con.csv file.  Fixing and re-running.

Guess you should have used mine.  :P :P :P :P :P :P :P :P hahaha. ;)

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 08:37:39 am
Re: NC: NC 74 (Future I-74) Opening Between US 421 and US 158
« Reply #14 on: September 02, 2020, 11:44:05 am »
A point also needs to be added for 226 for I-40 BL (Winston-Salem) unless we are fine with deleting that route now.

Anyone know if it is still posted?  GMSV from Sept 2019 shows it is.

NCDOT takes forever to de-post stuff.  Still awaiting on US 311 depost confirmation from somewhere plus the US 70 major reroute...

As far as I know, it still is.  I cannot easily find an update on the AARoads Forum or NCDOT's website.

This is the last I saw on US 311.

« Last Edit: September 02, 2020, 11:55:59 am by Markkos1992 »