WV: US 35 Final Stretch Upgraded to 4 Lanes
« on: June 09, 2021, 07:56:52 am »
This is expected to be opened in August based on the linked AARoads Forum post.  (https://www.aaroads.com/forum/index.php?topic=10692.msg2623634#msg2623634)

(rickmastfan67, note that I did not see a post from you in this thread.)

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1167
  • Gender: Male
  • Last Login:July 24, 2021, 11:35:52 pm
Re: WV: US 35 Final Stretch Upgraded to 4 Lanes
« Reply #1 on: June 09, 2021, 11:41:57 am »
(rickmastfan67, note that I did not see a post from you in this thread.)

Hmmm?  :P  https://www.aaroads.com/forum/index.php?topic=10692.msg2621692#msg2621692

I noticed in the news article that they specifically mentioned WV-869.  Does this mean that it will finally be signed?  Only time will tell.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1691
  • Last Login:Today at 07:08:19 am
Re: WV: US 35 Final Stretch Upgraded to 4 Lanes
« Reply #2 on: June 09, 2021, 12:25:05 pm »
Yeah, I am trying not to post links to threads moving forward that you and yakra (amongst other maintainers) have posted in.  I would rather it be posted here than not if possible.