Highway Data Discussion > 6-Month+ Highway Data Outlook
ID: ID41 south end
Duke87:
Looks to me like this should be a 1PPI situation. Don't need a point for SelWay, can just make I-90 the end.
Markkos1992:
Well looking at the new interchange design (https://www.aaroads.com/forum/index.php?topic=22904.msg2725848#msg2725848), I think you could argue that this should be a no-build.
the_spui_ninja:
Depends on if ID signs 41 to Seltice Way after the construction, IMO.
compdude787:
--- Quote from: the_spui_ninja on April 11, 2022, 10:38:02 am ---Depends on if ID signs 41 to Seltice Way after the construction, IMO.
--- End quote ---
Yeah, I'm going to hold off on doing anything here until after the interchange is reconstructed.
Also, looking at the Idaho Milepoint Log, it appears that the way it's currently mapped is correct--MP 0 is at the intersection with Seltice Way, not I-90. So, I think that settles it for now. Marking this as solved.
the_spui_ninja:
Maybe move it to the "6 Month+ Outlook" board just so this doesn't fall through the cracks to check up on when the interchange is done?
Navigation
[0] Message Index
[#] Next page
Go to full version