A couple upcoming projects along this corridor will lead to some minor realignments.
1. The current interchange at Scalp Ave (ScaAve) is being converted to a roundabout (https://www.penndot.gov/PennDOTWay/pages/Article.aspx?post=336). Right now this project is expected to be complete in 2022 (https://gis.penndot.gov/paprojects/Reports/ProjectReport.aspx?ProjectID=94476&ReportType=Anticipated).
2. A realignment just west of the PA 160 intersection (though they will still intersect at the same point). (https://www.penndot.gov/regionaloffices/district-9/pages/details.aspx?newsid=888) A temporary shaping point has been added at beginning of the realignment on the current alignment. (https://github.com/TravelMapping/HighwayData/pull/4571) The work for the realignment of PA 756 should be completed later this year.
EDIT (4-6-2021): The first project mentioned is starting on Monday, April 12, 2021, with completion expected in November 2022. (https://www.penndot.gov/RegionalOffices/district-9/pages/details.aspx?newsid=915)
EDIT (5-12-2021): The realignment portion of project one begins on May 17, 2021. (https://www.penndot.gov/RegionalOffices/district-9/pages/details.aspx?newsid=930)
-
PennDOT - District 9 News: Detour to be Placed for Next Phase of Work to Realign Routes 160/756 (Elton Intersection) in Cambria County (Cranberry Township) (For PA 160/PA 756) (https://www.penndot.gov/RegionalOffices/district-9/pages/details.aspx?newsid=967)
This means that Project 2 should be done by October 2021.
-
It looks like based on this news release that I can move forward with the Project 1 changes. (https://www.penndot.gov/RegionalOffices/district-9/pages/details.aspx?newsid=991)
EDIT: https://github.com/TravelMapping/HighwayData/pull/5098
EDIT (9-22-2021): https://www.penndot.gov/RegionalOffices/district-9/pages/details.aspx?newsid=995
-
I am not sure if the realignment at PA 160 is complete or not, but I may readjust my route plan for my Saturday trip to field check this.
-
Field checking this shows the realignment of PA 756 as complete despite the project still being under construction. (https://github.com/TravelMapping/HighwayData/pull/5298)
Anyway this means that this thread is completed.