Author Topic: PA: PA 576 Extension From US 22 to I-79  (Read 3616 times)

0 Members and 1 Guest are viewing this topic.

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 08:33:17 am
PA: PA 576 Extension From US 22 to I-79
« on: February 03, 2021, 03:31:23 pm »
Right now this route is still supposed to be open by the fall of 2021.

https://www.patpconstruction.com/southern_beltway/22to79/

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4234
  • Last Login:February 13, 2024, 07:19:36 pm
  • I like C++
Re: PA: PA 576 Extension From US 22 to I-79
« Reply #1 on: February 03, 2021, 03:49:40 pm »
Nice. Looks like maybe CecReiRd could be placed on PA50 now?
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 08:33:17 am
Re: PA: PA 576 Extension From US 22 to I-79
« Reply #2 on: February 03, 2021, 06:38:42 pm »
Nice. Looks like maybe CecReiRd could be placed on PA50 now?

Actually the road name is South Fayette Way here so FayWay is the label.  (https://github.com/TravelMapping/HighwayData/pull/4533)

I went ahead and also unhid FortCheRd on PA 980 as the PA Turnpike states that, "The permanent traffic pattern has been
enacted."

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1829
  • Gender: Male
  • Last Login:Yesterday at 06:08:33 pm
Re: PA: PA 576 Extension From US 22 to I-79
« Reply #3 on: February 03, 2021, 11:45:02 pm »
Right now this route is still supposed to be open by the fall of 2021.

https://www.patpconstruction.com/southern_beltway/22to79/

Yet, not all the movements will be open @ I-79 till 2022.

Quote
The Southern Beltway will be open to traffic in the Fall of 2021 with restrictions at I-79. Northbound I-79 traffic will be able to head west on the Southern Beltway and eastbound traffic on the Southern Beltway will be able to head south on I-79. All connections to and from I-79 will be open in 2022.

If I have to make a guess, then we will have to update 576 in two stages (To Exit #18 I-79, then to Exit #19 Morganza Road). Since if you can only go from EB PA-576 to SB I-79, & the ramps to Exit 19 also include the EB PA-576 to I-79 NB movement, the moment to Morganza Road road will open in 2022 as well.
« Last Edit: February 03, 2021, 11:51:57 pm by rickmastfan67 »

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 08:33:17 am
Re: PA: PA 576 Extension From US 22 to I-79
« Reply #4 on: February 04, 2021, 12:28:37 pm »
This image shows the I-79/Morganza Rd interchange much better.  I presume we will want the end point where the ramps to Morganza Rd split from the ramps to/from I-79 NB.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1829
  • Gender: Male
  • Last Login:Yesterday at 06:08:33 pm
Re: PA: PA 576 Extension From US 22 to I-79
« Reply #5 on: February 04, 2021, 12:41:31 pm »
I think we'll still want '19' right @ Morganza Road due to the ramps to NB I-79 still getting the #18B number (and can be considered as 1PPI with the other ramps for I-79), while Morganza gets #19.

Also, don't know what they are thinking making that a left-on merge from I-79 NB to PA-576 WB when they extend the highway in the future.  Maybe it will have a divider in the future to prevent idiots from dive-bombing the #18B ramp to I-79 NB in case there's a backup on I-79 itself and they want to try to bypass it.

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4234
  • Last Login:February 13, 2024, 07:19:36 pm
  • I like C++
Re: PA: PA 576 Extension From US 22 to I-79
« Reply #6 on: February 05, 2021, 01:09:29 am »
re 1PPI, this looks like a case of 2 (partially overlapping?) interchanges to my eyes
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1829
  • Gender: Male
  • Last Login:Yesterday at 06:08:33 pm
Re: PA: PA 576 Extension From US 22 to I-79
« Reply #7 on: February 06, 2021, 01:39:16 am »
re 1PPI, this looks like a case of 2 (partially overlapping?) interchanges to my eyes

Yes, it does look like that, but Markkos1992 thought the Exit 18 ramps that sorta overlap the Exit 19 justified a possible centered point for both of them combined.  That's why I mentioned the 1PPI think for the I-79 ramps.  They should all be together @ the overpass and the Exit 19 ramps should be a completely separate point (especially due to future extension of the route hopefully) @ Morganza Road.

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 08:33:17 am
Re: PA: PA 576 Extension From US 22 to I-79
« Reply #8 on: February 06, 2021, 11:45:41 am »
So that we can visualize this, I put the below in the WP Editor.

18 http://www.openstreetmap.org/?lat=40.319937&lon=-80.146809
19 http://www.openstreetmap.org/?lat=40.305156&lon=-80.150907

18 is centered at the planned I-79/PA 576 interchange with 19 at Morganza Rd.  I believe that this is what we utimately want.  The question now would be whether to extend to 19 originally, extend to 19 at first with a closed point, or extend it in two parts (18 first then 19 second).  Personally, I would consider the road clinched either way if taking the I-79 NB to PA 576 NB movement.

What I was thinking originally for a more temporary solution was the below version that would have two points at I-79.

18 http://www.openstreetmap.org/?lat=40.319937&lon=-80.146809
19 http://www.openstreetmap.org/?lat=40.309214&lon=-80.150285
18A http://www.openstreetmap.org/?lat=40.307709&lon=-80.158010



Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1829
  • Gender: Male
  • Last Login:Yesterday at 06:08:33 pm
Re: PA: PA 576 Extension From US 22 to I-79
« Reply #9 on: February 06, 2021, 02:26:33 pm »
So that we can visualize this, I put the below in the WP Editor.

18 http://www.openstreetmap.org/?lat=40.319937&lon=-80.146809
19 http://www.openstreetmap.org/?lat=40.305156&lon=-80.150907

18 is centered at the planned I-79/PA 576 interchange with 19 at Morganza Rd.  I believe that this is what we utimately want.  The question now would be whether to extend to 19 originally, extend to 19 at first with a closed point, or extend it in two parts (18 first then 19 second).  Personally, I would consider the road clinched either way if taking the I-79 NB to PA 576 NB movement.

What I was thinking originally for a more temporary solution was the below version that would have two points at I-79.

18 http://www.openstreetmap.org/?lat=40.319937&lon=-80.146809
19 http://www.openstreetmap.org/?lat=40.309214&lon=-80.150285
18A http://www.openstreetmap.org/?lat=40.307709&lon=-80.158010

I agree with the first visualization

And yeah, that 'temp' idea, I don't think would have flied personally.

Offline vdeane

  • Sr. Member
  • ****
  • Posts: 387
  • Gender: Female
  • Last Login:Yesterday at 09:57:32 pm
    • New York State Roads
Re: PA: PA 576 Extension From US 22 to I-79
« Reply #10 on: February 06, 2021, 06:46:29 pm »
Personally, I would consider the road clinched either way if taking the I-79 NB to PA 576 NB movement.
Yeah, all the movements from that part of the I-79 interchange enter/exit PA 576 at the same spots as the Morganza Road ramps (OSM shows one running parallel through the rest of the interchange, presumably to keep people from cutting across the road until past the other ramps; this would seem to be the reverse of the I-77/I-64 interchange in Beckley).
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 08:33:17 am
Re: PA: PA 576 Extension From US 22 to I-79
« Reply #11 on: May 13, 2021, 06:23:33 am »
https://www.aaroads.com/forum/index.php?topic=2294.msg2613394#msg2613394

Current plan is still for this road to open in October 2021.  Note that I plan to extend this to 19 as shown in the first visualization above when the road opens to I-79.  It seems to be the best solution to me.

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 08:33:17 am
Re: PA: PA 576 Extension From US 22 to I-79
« Reply #12 on: September 22, 2021, 04:48:33 pm »

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3075
  • Last Login:Today at 08:33:17 am
Re: PA: PA 576 Extension From US 22 to I-79
« Reply #13 on: September 26, 2021, 04:15:15 pm »

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1829
  • Gender: Male
  • Last Login:Yesterday at 06:08:33 pm
Re: PA: PA 576 Extension From US 22 to I-79
« Reply #14 on: October 10, 2021, 12:04:52 am »