Author Topic: Alberta outlook  (Read 17316 times)

0 Members and 1 Guest are viewing this topic.

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Alberta outlook
« on: September 21, 2017, 03:28:02 am »
CHM forum thread
http://www.transportation.alberta.ca/projects/
https://www.transportation.alberta.ca/documents/2017-20ProvincialConstructionProgram.pdf

AB28:
Quote
Various curve revisions: west of Redwater,
Hwy. 38, north of Redwater
AB38 reconfig shown in Google; no free sources yet (OSM, BingSat, GeoBase 14.0: 2018-01-21)
« Last Edit: January 21, 2018, 01:23:59 am by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1584
  • Last Login:Today at 04:36:02 pm
    • Hot Springs and Highways pages
Re: Alberta outlook
« Reply #1 on: August 28, 2018, 11:16:33 pm »
In case it's not already on your radar, AB 43X is being extended to meet AB 43 west of Grande Prairie, to create a northern bypass of the city. That would let through travelers avoid the painful slog through the city that I endured earlier today. The extension does not look like opening is imminent.

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
« Last Edit: October 25, 2018, 12:31:30 am by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Alberta outlook
« Reply #3 on: September 02, 2019, 09:22:47 am »
Reports from mid-July said the AB43X extension would be open by the end of August. I've not found any more recent news of the actual opening.
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Alberta outlook
« Reply #4 on: September 04, 2019, 11:55:42 am »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Alberta outlook
« Reply #5 on: September 24, 2020, 05:09:53 pm »
Recent: Alberta openings #4194
AB43 relocated onto AB43X
• AB201 (Woodbine) opened
• AB201SCa extended, 5->9
• AB201 (Signal Hill) added


Watchlist

Check signage / GMSV
ItemImagery    Retrieved
Old AB453, Grande Prairie(pre-2019)(before 2020-09-24)
AB201SCa/22X: Exit 6 really 7?U/C2021-05-10)

ToDo:
AB28/651 jct
AB28/38 jct
AB63 N terminus

CSVs into credits.php
routings/termini from CSVs

2020
end of this year: AB201 exits 9-13 (This is contradicted by every other source I've seen)

2021
Before summer? Fall Tofield bypass
10/01: AB201 exits 9-13
Fall? Tofield bypass

2023
Fall: AB2 interchange @ 40th Avenue, Airdrie

2024-10-01: AB201 north of Hwy 8 to Exit 36
When? AB201 along AB8 from Exit 22, I'd expect at that same time or maybe sooner if it gets upgraded along the way.
« Last Edit: May 10, 2021, 04:45:29 pm by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Alberta outlook
« Reply #6 on: October 01, 2021, 05:03:16 pm »
The final stretch of the southwest Calgary ring road is scheduled to open Saturday.

A member of the project team said the last sections of the road stretching from Fish Creek Boulevard to Highway 22X is scheduled to open at 4 p.m., although the provincial government would not confirm the opening, saying there will be an announcement about the section “shortly.”
Quote
The west portion of the ring road is scheduled to be completed in 2023, the South Bow River Bridge project is scheduled to be complete in 2023 and the northeast Stoney Trail widening project is scheduled to be finished later this year.
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Alberta outlook
« Reply #7 on: October 03, 2021, 05:15:26 pm »
Done
#5179 merge AB201SCa into AB201SWC
#5612 Tofield bypass


Watchlist

Check signage / GMSV
ItemImagery    Retrieved
Old AB43, Grande PrairieJul 20222022-11-05

2023
Summer: AB201 @ 11 St NE
Fall: AB2 interchange @ 40th Avenue, Airdrie

2024
10-01: West Calgary Ring Road
« Last Edit: January 18, 2023, 12:41:53 am by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Alberta outlook
« Reply #8 on: October 13, 2023, 09:21:15 am »
Done
#6880 AB201 extended to exit 32


Watchlist

Check signage / GMSV
ItemImagery    Retrieved
Old AB43, Grande PrairieJul 20222022-11-05

2023
10-13: AB2 interchange @ 40th Avenue, Airdrie (confirm exit number)
Fall: AB201 @ 11 St NE

2024
10-01: West Calgary Ring Road

2025
Fall: AB1A/22

2026
Yellowhead Trail Freeway Conversion
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Alberta outlook
« Reply #9 on: January 01, 2024, 10:30:26 am »
Done
AB2 interchange @ 40th Avenue, Airdrie
West Calgary Ring Road


Watchlist

Check signage / GMSV
ItemImagery    Retrieved
Old AB43, Grande PrairieJul 20222022-11-05

2023
Fall: AB201 @ 11 St NE (confirm)

2026
Summer: AB3 twinning, Taber to Burdett (phase 1/8)
Yellowhead Trail Freeway Conversion
AB1A/22

When?
AB2 TR210 interchange
« Last Edit: July 09, 2024, 02:27:58 am by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Alberta outlook
« Reply #10 on: September 26, 2024, 05:54:02 pm »
Done
AB AB201 57 (11 St NE)


Watchlist

Check signage / GMSV
ItemImagery    Retrieved
Old AB43, Grande PrairieJul 20222024-10-08

2026
Summer: AB3 twinning, Taber to Burdett (phase 1/8)
Yellowhead Trail Freeway Conversion
AB1A/22

When?
AB2 TR210 interchange
« Last Edit: October 08, 2024, 09:25:58 pm by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca