Author Topic: Pennsylvania Outlook  (Read 1891 times)

0 Members and 1 Guest are viewing this topic.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2579
  • Last Login:Yesterday at 11:05:11 pm
Pennsylvania Outlook
« on: May 28, 2021, 11:39:11 am »
The goal is for me to include all PA future threads here moving forward. This is a placeholder post more than anything else.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2579
  • Last Login:Yesterday at 11:05:11 pm
PA: I-80 (Future Exit 163)
« Reply #1 on: October 15, 2021, 08:29:25 am »
https://www.aaroads.com/forum/index.php?topic=23084.msg2671448#msg2671448  (expected to be complete in Fall 2022)

Shaping points for new interchange added here previously:  https://github.com/TravelMapping/HighwayData/pull/3989

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2579
  • Last Login:Yesterday at 11:05:11 pm
PA: PA 26 at PA45_E
« Reply #2 on: March 05, 2022, 12:27:01 pm »
« Last Edit: September 16, 2022, 04:57:29 pm by Markkos1992 »

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2579
  • Last Login:Yesterday at 11:05:11 pm
PA: US 30 Realignment East of WV Line
« Reply #3 on: April 11, 2022, 10:34:11 am »

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2579
  • Last Login:Yesterday at 11:05:11 pm

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2579
  • Last Login:Yesterday at 11:05:11 pm
PA: US 202 ALT TRUCK (North Wales) Removal
« Reply #5 on: April 24, 2022, 01:54:24 pm »
The weight-restricted bridge that created this route has already been replaced (currently with 2 lanes carrying both directions of US 202) as part of the ongoing US 202 Widening Project from 2 lanes to 4 lanes.  I clarified this through a field check yesterday.

I plan to check with District 6 to see if they are going to keep the truck route signed until the widening project is complete or not.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2579
  • Last Login:Yesterday at 11:05:11 pm
PA: PA 443 at PA 902 Realignment
« Reply #6 on: September 03, 2022, 06:50:44 pm »
https://www.penndot.pa.gov/RegionalOffices/district-5/ConstructionsProjectsAndRoadwork/Pages/PA-443-Improvements-in-Carbon-County.aspx

There will be a realignment of the PA 443/PA 902 intersection as part of a PA 443 widening to three lanes in the area.  Construction is currently expected to be complete in September 2024.

Also: http://www.penndot.gov/regionaloffices/district-5/pages/details.aspx?newsid=3299
« Last Edit: September 04, 2022, 04:33:14 pm by Markkos1992 »