Author Topic: FL 429 partly completed to north end  (Read 6086 times)

0 Members and 1 Guest are viewing this topic.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3099
  • Last Login:Yesterday at 11:23:57 pm
Re: FL 429 partly completed to north end
« Reply #15 on: March 18, 2023, 05:21:36 am »
Wow that was quick from GSV.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1841
  • Gender: Male
  • Last Login:Yesterday at 04:13:11 am
Re: FL 429 partly completed to north end
« Reply #16 on: August 12, 2023, 01:53:27 am »
Just bloody fun.  FDOT's changing exit numbers around again.......................................

Seems FDOT doesn't know what to number the final two exits as........

Signage near the split from FL-46 say the final two exits are 53 & 54.

Meanwhile, near the 'supposed' exit 53, signage says something completely different....... 54 & 55.........

(Both GSV images are from April '23.)

So much for trusting signage plans if FDOT can't even get it right themselves..........

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1841
  • Gender: Male
  • Last Login:Yesterday at 04:13:11 am
Re: FL 429 partly completed to north end
« Reply #17 on: January 28, 2024, 05:40:33 pm »
Signage near the split from FL-46 say the final two exits are 53 & 54.

Signage was still up showing these numbers as of Aug '23.

Highway officially opened yesterday (01/27/24).  So, hopefully somebody will be able to travel it very soon and verify the following exit numbers in case I need to fix them in the file that's currently on the site.

Offline cockroachking

  • Jr. Member
  • **
  • Posts: 78
  • Gender: Male
  • Last Login:Yesterday at 10:43:33 am
Re: FL 429 partly completed to north end
« Reply #18 on: January 28, 2024, 06:32:24 pm »
Hmm. These signs from April 2023 say 54 and 55.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1841
  • Gender: Male
  • Last Login:Yesterday at 04:13:11 am
Re: FL 429 partly completed to north end
« Reply #19 on: January 28, 2024, 06:34:07 pm »
Hmm. These signs from April 2023 say 54 and 55.

I know.  That's why it's super confusing and would love a field check, as the '53 & 54' was what was in the original plans.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1841
  • Gender: Male
  • Last Login:Yesterday at 04:13:11 am
Re: FL 429 partly completed to north end
« Reply #20 on: January 29, 2024, 02:47:10 am »
Hmm. These signs from April 2023 say 54 and 55.

I know.  That's why it's super confusing and would love a field check, as the '53 & 54' was what was in the original plans.

Now this post over @ AARoads says it's 55B & 55A instead of either of the mentioned above schemes, with no changes to FL-417.  Only way to lay this to rest would be photos. LOL!

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 1841
  • Gender: Male
  • Last Login:Yesterday at 04:13:11 am
Re: FL 429 partly completed to north end
« Reply #21 on: February 13, 2024, 09:04:09 pm »
Only Alex posted pictures over @ AARoads of the numbers on FL-429.
https://www.aaroads.com/forum/index.php?topic=2017.msg2906240#msg2906240

Changes as follows for FL-429:

53 -> 55B
54 -> 55A

https://github.com/TravelMapping/HighwayData/pull/7216

With this, we can finally call this as solved. :)