Author Topic: NC: I-73 / I-74 / US 220  (Read 2247 times)

0 Members and 1 Guest are viewing this topic.

Offline dfilpus

  • Full Member
  • ***
  • Posts: 150
  • Gender: Male
  • Last Login:Yesterday at 01:18:57 pm
    • Filpus Roadgeek
NC: I-73 / I-74 / US 220
« on: September 11, 2018, 10:02:47 am »
The I-73/I-74/US 220 freeway south of Ellerbe is now fully open and signed to the split between US 220 and the Rockingham Bypass (I-73/I-74). There is a new interchange, exit 23, at Haywood Cemetery Road/ Dockery Road and a partially constructed interchange for the split, which is not signed, but will be exit 22, when the Bypass is continued. There are END I-73/74 signs on the ramp to US 220.

I-73 and I-74 need to be extended to the future exit 22 and US 220 synced with the new interchanges.

Offline mapmikey

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1179
  • Last Login:Yesterday at 11:04:21 pm
    • Co-curator Virginia Highways Project
Re: NC: I-73 / I-74 / US 220
« Reply #1 on: September 14, 2018, 10:14:19 pm »
points added; queued and solved

Offline dfilpus

  • Full Member
  • ***
  • Posts: 150
  • Gender: Male
  • Last Login:Yesterday at 01:18:57 pm
    • Filpus Roadgeek
Re: NC: I-73 / I-74 / US 220
« Reply #2 on: September 16, 2018, 10:03:05 am »
Waypoints 22(73) and 23(73) are in the wrong order in I-74 High Point.

Offline mapmikey

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1179
  • Last Login:Yesterday at 11:04:21 pm
    • Co-curator Virginia Highways Project
Re: NC: I-73 / I-74 / US 220
« Reply #3 on: September 22, 2018, 10:58:47 am »
corrected...thanks