Travel Mapping

Highway Data Discussion => Updates to Highway Data => Solved Highway data updates => Topic started by: nwi_irish96 on December 06, 2016, 06:33:41 pm

Title: IN/KY: IN 265/KY 841/Future I-265
Post by: nwi_irish96 on December 06, 2016, 06:33:41 pm
The East End Ohio River Bridge and connecting roadways will open Sunday 12/18, completing the gap between the IN 265/IN 62 interchange and the KY 841/US 42 interchange.
Title: Re: IN/KY: IN 265/KY 841/Future I-265
Post by: mapcat on December 06, 2016, 10:54:44 pm
Thanks. I'll watch for the announcement and update everything shortly thereafter.
Title: Re: IN/KY: IN 265/KY 841/Future I-265
Post by: nwi_irish96 on December 18, 2016, 06:15:00 pm
Roadway and bridge now open.  Please update the database so I can update my log.
Title: Re: IN/KY: IN 265/KY 841/Future I-265
Post by: mapcat on December 18, 2016, 06:41:09 pm
Thanks for the report. Is everything signed I-265 now?
Title: Re: IN/KY: IN 265/KY 841/Future I-265
Post by: nwi_irish96 on December 18, 2016, 06:44:32 pm
No, the Indiana section is signed IN 265 and the Kentucky section is signed KY 841.  Everybody assumes that the I-265 designation is forthcoming but I haven't seen anything official regarding it.

Edited to add: On IN 265 there is an Exit 11 for Salem Rd that should be a waypoint.
Title: Re: IN/KY: IN 265/KY 841/Future I-265
Post by: mapcat on December 18, 2016, 07:05:07 pm
OK, thanks. I'll extend the existing state routes and future interstates and switch to I-265 when it becomes official.
Title: Re: IN/KY: IN 265/KY 841/Future I-265
Post by: mapcat on December 19, 2016, 12:01:39 am
Changes are live in the HB.