Various curve revisions: west of Redwater,AB38 reconfig shown in Google; no free sources yet (OSM, BingSat, GeoBase 14.0: 2018-01-21)
Hwy. 38, north of Redwater
Item | Imagery | Retrieved |
Old AB453, Grande Prairie | (pre-2019) | (before 2020-09-24) |
AB201SCa/22X: Exit 6 really 7? | U/C | 2021-05-10) |
The final stretch of the southwest Calgary ring road is scheduled to open Saturday.
A member of the project team said the last sections of the road stretching from Fish Creek Boulevard to Highway 22X is scheduled to open at 4 p.m., although the provincial government would not confirm the opening, saying there will be an announcement about the section “shortly.”
The west portion of the ring road is scheduled to be completed in 2023, the South Bow River Bridge project is scheduled to be complete in 2023 and the northeast Stoney Trail widening project is scheduled to be finished later this year.
Item | Imagery | Retrieved |
Old AB43, Grande Prairie | Jul 2022 (https://www.google.com/maps/@55.17069,-118.8182769,3a,15y,294.09h,90.19t/data=!3m10!1e1!3m8!1sYR-JqA-PYNUykQVPWNsGGw!2e0!5s20220701T000000!7i16384!8i8192!9m2!1b1!2i40) | 2022-11-05 |
Item | Imagery | Retrieved |
Old AB43, Grande Prairie | Jul 2022 (https://www.google.com/maps/@55.17069,-118.8182769,3a,15y,294.09h,90.19t/data=!3m10!1e1!3m8!1sYR-JqA-PYNUykQVPWNsGGw!2e0!5s20220701T000000!7i16384!8i8192!9m2!1b1!2i40) | 2022-11-05 |
Item | Imagery | Retrieved |
Old AB43, Grande Prairie | Jul 2022 (https://www.google.com/maps/@55.17069,-118.8182769,3a,15y,294.09h,90.19t/data=!3m10!1e1!3m8!1sYR-JqA-PYNUykQVPWNsGGw!2e0!5s20220701T000000!7i16384!8i8192!9m2!1b1!2i40) | 2022-11-05 |
Item | Imagery | Retrieved |
Old AB43, Grande Prairie | Jul 2022 (https://www.google.com/maps/@55.17069,-118.8182769,3a,15y,294.09h,90.19t/data=!3m10!1e1!3m8!1sYR-JqA-PYNUykQVPWNsGGw!2e0!5s20220701T000000!7i16384!8i8192!9m2!1b1!2i40) | 2024-10-08 |