Travel Mapping
Highway Data Discussion => In-progress Highway Systems & Work => Completed Highway Systems Threads => Topic started by: michih on September 25, 2017, 03:52:04 pm
-
Fine except of:
Rt2:
I think exit 4 and 5 are mistaken. From the south, the first exit is 4 (not 5) and the 2nd one 5. From the north, there is only exit 4
Rt3:
+X01 is off track
Rt4:
Exit 2B missing
Is exit 9B really necessary?
Rt8:
Remove "End" because there is no (dead) end
Rt9:
10QA --> 10A
Exceeds limits b/n exit 22 and exit 23
-
Rt2:
I think exit 4 and 5 are mistaken. From the south, the first exit is 4 (not 5) and the 2nd one 5. From the north, there is only exit 4
5 is definitely signed southbound (from the north). It's after exit 4 comes off. Northbound the slip for exit 4 goes under the exit 5 interchange to end on the local roads that the southbound exit has. Therefore the strange 3B-5-4 order is correct.