Travel Mapping
Highway Data Discussion => Updates to Highway Data => Solved Highway data updates => Topic started by: dfilpus on September 11, 2018, 10:02:47 am
-
The I-73/I-74/US 220 freeway south of Ellerbe is now fully open and signed to the split between US 220 and the Rockingham Bypass (I-73/I-74). There is a new interchange, exit 23, at Haywood Cemetery Road/ Dockery Road and a partially constructed interchange for the split, which is not signed, but will be exit 22, when the Bypass is continued. There are END I-73/74 signs on the ramp to US 220.
I-73 and I-74 need to be extended to the future exit 22 and US 220 synced with the new interchanges.
-
points added; queued and solved
-
Waypoints 22(73) and 23(73) are in the wrong order in I-74 High Point.
-
corrected...thanks