Travel Mapping

Highway Data Discussion => Updates to Highway Data => Solved Highway data updates => Topic started by: Markkos1992 on February 11, 2021, 08:03:03 pm

Title: NC:US 64 ALT (Bethel), US 258, NC 33, NC 111, NC 122 Point Errors Around Tarboro
Post by: Markkos1992 on February 11, 2021, 08:03:03 pm
US 64 ALT (Bethel):
1.  Posting shows this route extended along US 258/NC 111/NC 122 to US 64 (Exit 486) (https://www.google.com/maps/@35.8897725,-77.5315227,3a,75y,271.96h,81.51t/data=!3m6!1e1!3m4!1sYFp1Zevt8Kj6pibD_bC-Rg!2e0!7i13312!8i6656).  Also US258/64Bus should be changed to US258/33.
2.  NC33_S should be NC33_E (https://www.google.com/maps/@35.878042,-77.5224679,3a,75y,177.79h,98.5t/data=!3m6!1e1!3m4!1sqzQ7gAtxky-vgbCMDlKkVQ!2e0!7i13312!8i6656).

US 258:
1.  US64/111 should be US64(485).
2.  US64_E should be US64(486).
3.  NC111_E should be NC111_N.
4.  NC122 should be NC122_N.

NC 33:  US64Alt should be US64Alt_E.

NC 111:
1.  NC122_W should be NC122_S (https://www.google.com/maps/@35.821374,-77.6347817,3a,75y,202.49h,88.97t/data=!3m6!1e1!3m4!1sKw0hHVnVy03QR9fa7NxiNQ!2e0!7i13312!8i6656).
2.  US64_W should be marked as closed.
3.  The US64/258 needs to be synced with US 64 and US 258 (also affects US 64 Alternate (Tarboro), which is currently synced with NC 111 and NC 122)).  Also US64/258 should be US64(485).
4.  US64_E should be US64(486).
5.  It looks like the first shaping point between US258_N and NC142 could be made into a visible point at Chinquapin Rd  (ChiRd) (https://www.google.com/maps/@35.8800958,-77.4549993,3a,37.5y,314.23h,85.43t/data=!3m6!1e1!3m4!1s8SQaaBjcH1QmJbHES2etMQ!2e0!7i13312!8i6656), which connects directly to US 64.
6.  It looks like the shaping point between NC142 and NC11/42 could be made into a visible point at Old Cotton Rd (OldCotRd) (https://www.google.com/maps/@35.9446824,-77.3437753,3a,75y,296.37h,90.36t/data=!3m6!1e1!3m4!1sE_4FRH-VhaTArg25fN-ySg!2e0!7i13312!8i6656).

NC 122:
1.  NC111_TarW should be NC111_TarS.  NC111_TarE should be NC111_TarN.
2.  US64_W should be US64(484).
3.  HowAve should be HowAve_W (https://www.google.com/maps/@35.8938015,-77.5917519,3a,75y,44.32h,87.29t/data=!3m6!1e1!3m4!1sbOkaCdck37naajOdi44huw!2e0!7i13312!8i6656).
4.  See number 3 under NC 111.  Also US64/258 should be US64(485).
5.  US64_E should be US64(486).
6.  I recommend checking to see if any of the shaping points between US258_N and NC97 should be made visible somehow.
Title: Re: NC:US 64 ALT (Bethel), US 258, NC 33, NC 111, NC 122 Point Errors Around Tarboro
Post by: mapmikey on February 27, 2021, 07:41:35 pm
All changes made.

Note this eliminates US64altbet entirely as the two US 64 ALT routes are posted as one continuous route in both directions...
Title: Re: NC:US 64 ALT (Bethel), US 258, NC 33, NC 111, NC 122 Point Errors Around Tarboro
Post by: bhemphill on February 28, 2021, 10:49:15 am
The route link on the update page goes to a route does not exist page.  nc.us64alttar is the link instead of nc.us064alttar
Title: Re: NC:US 64 ALT (Bethel), US 258, NC 33, NC 111, NC 122 Point Errors Around Tarboro
Post by: mapmikey on March 19, 2021, 10:32:20 pm
typo fix was requested