Travel Mapping

Highway Data Discussion => Updates to Highway Data => Solved Highway data updates => Topic started by: Markkos1992 on July 13, 2021, 07:05:10 pm

Title: NC/VA: US 258 Corridor (Tarboro, NC, to Windsor, VA) Point Concerns
Post by: Markkos1992 on July 13, 2021, 07:05:10 pm
US 258:
1.  NC122_N should be slightly recentered. (also affects US258_N on NC 122)
2.  NC561 should be NC561_W (https://www.google.com/maps/@36.1948201,-77.3942241,3a,75y,249.39h,91.88t/data=!3m6!1e1!3m4!1sSurhB3Ms--0-P-koBL5S7w!2e0!7i13312!8i6656).
3.  The shaping point north of NC305/561 should probably be replaced with a visible point at Lovers Lane Rd (LovLaneRd) (https://www.google.com/maps/@36.3034214,-77.2667837,3a,75y,53.89h,88.51t/data=!3m6!1e1!3m4!1sS9cXN2PXQcxHKI3x00wHwA!2e0!7i13312!8i6656).
4.  The shaping point of NC35_N should probably be replaced with a visible point at Pinetops Rd (PinRd) (https://www.google.com/maps/@36.3828425,-77.1599178,3a,15y,46.95h,90t/data=!3m6!1e1!3m4!1s5kb5bDJmrlFID-5cVn06Eg!2e0!7i13312!8i6656).
5.  I recommend replacing SchHouRd with nearby Spiers Rd (SpiRd) (https://www.google.com/maps/@36.5010842,-77.0073286,3a,15y,265.32h,89.54t/data=!3m6!1e1!3m4!1sym94MqbFy6wOtXa9GaHWRw!2e0!7i13312!8i6656).
6.  The shaping point between US58_E and US58Bus/258Bus should be replaced with a visible point at Union Camp Dr (UniCampDr) (https://www.google.com/maps/@36.6782522,-76.9047835,3a,15y,325.18h,88.88t/data=!3m6!1e1!3m4!1sA33XsIyzd4MlihDrUzg9nA!2e0!7i13312!8i6656).
7.  JoySt should be replaced with SR614 (https://www.google.com/maps/@36.7764095,-76.8426034,3a,75y,274.15h,85.91t/data=!3m6!1e1!3m4!1scqvIbmONrOagSueqtXtiIQ!2e0!7i13312!8i6656) nearby.
8.  (Added later)  I think that US258BusSmi/10_S should be US258BusSmi/10 or some version of that.

NC 305/NC 561:  The shaping point east of US258_N should be replaced with a visible point at Tyler Rd (TylRd) (https://www.google.com/maps/@36.2707166,-77.2342821,3a,15y,222.13h,87.14t/data=!3m6!1e1!3m4!1sQhrPDHHngmHuCPXQQRp29g!2e0!7i13312!8i6656).  I did not do a full review of NC 561, but it would be useful to check on the shaping (especially around I-95 where its seems to go out of tolerance briefly).
Title: Re: NC/VA: US 258 Corridor (Tarboro, NC, to Windsor, VA) Point Concerns
Post by: mapmikey on July 13, 2021, 07:54:23 pm
changes made and in the queue
Title: Re: NC/VA: US 258 Corridor (Tarboro, NC, to Windsor, VA) Point Concerns
Post by: Markkos1992 on July 18, 2021, 08:40:11 am
US 258:
6.  The shaping point between US58_E and US58Bus/258Bus should be replaced with a visible point at Union Camp Dr (UniCampDr) (https://www.google.com/maps/@36.6782522,-76.9047835,3a,15y,325.18h,88.88t/data=!3m6!1e1!3m4!1sA33XsIyzd4MlihDrUzg9nA!2e0!7i13312!8i6656).

It looks like UniCampRd should still be made UniCampDr.  Otherwise, the rest of this thread is complete.
Title: Re: NC/VA: US 258 Corridor (Tarboro, NC, to Windsor, VA) Point Concerns
Post by: mapmikey on August 16, 2021, 07:46:37 pm
fixed
Title: Re: NC/VA: US 258 Corridor (Tarboro, NC, to Windsor, VA) Point Concerns
Post by: Markkos1992 on August 31, 2021, 08:50:48 am
Note that this should be completed in the next VA Update.