Travel Mapping

Highway Data Discussion => Updates to Highway Data => Solved Highway data updates => Topic started by: Markkos1992 on August 20, 2021, 01:43:21 pm

Title: UT 154: New Interchange at 6200S
Post by: Markkos1992 on August 20, 2021, 01:43:21 pm
https://www.aaroads.com/forum/index.php?topic=20323.msg2652062#msg2652062

You could add the point now if you so desire.
Title: Re: UT 154: New Interchange at 6200S
Post by: US 89 on August 22, 2021, 10:36:48 am
The same project is adding interchanges at 10400 South and 12600 South. Those are state highway junctions so they have TM waypoints already, but they’ll be getting new exit numbers once they’re done.

In fact, almost all of the remaining at-grades on Bangerter will be converted to interchanges in the next 10 years or so: https://www.bangerterprojects.com/schedule
Title: Re: UT 154: New Interchange at 6200S
Post by: Duke87 on September 06, 2021, 07:20:29 pm
Assuming the interchange will be numbered, I'm holding off on adding the point until it opens so I don't have to relabel it.
Title: Re: UT 154: New Interchange at 6200S
Post by: US 89 on September 07, 2021, 01:30:24 am
Given that it is exactly halfway between two existing interchanges at 7000 South (exit 14) and 5400 South (exit 16), I’d say it’s a pretty safe bet this will be exit 15...

Title: Re: UT 154: New Interchange at 6200S
Post by: Duke87 on September 10, 2021, 07:23:16 pm
Given that it is exactly halfway between two existing interchanges at 7000 South (exit 14) and 5400 South (exit 16), I’d say it’s a pretty safe bet this will be exit 15...

Fair enough, but I still am not supposed to label it "15" if it isn't yet signed as such!
Title: Re: UT 154: New Interchange at 6200S
Post by: Markkos1992 on December 06, 2021, 12:56:21 pm
The project website seems to indicate that the interchange is now partially open (https://www.udot.utah.gov/bangerter6200south/#/).
Title: Re: UT 154: New Interchange at 6200S
Post by: Duke87 on January 27, 2022, 09:53:36 pm
https://github.com/TravelMapping/HighwayData/pull/5558 adds exit 15, puts a couple other new exit numbers on existing interchanges, and recenters a few points.
Title: Re: UT 154: New Interchange at 6200S
Post by: Markkos1992 on January 28, 2022, 01:52:20 am
It looks like the UT 209 point at UT 154 is at the wrong interchange.
Title: Re: UT 154: New Interchange at 6200S
Post by: Duke87 on February 01, 2022, 10:59:33 pm
Good catch. Copy and paste is a dangerous weapon if mishandled!  :pan: