Taking a gander at ODOT's sign order databank, it appears as though OR 224 will be rerouted to the Sunrise Corridor once the mainline opens (this summer?). OR 212 will remain on its current routing.
-
Taking a gander at ODOT's sign order databank, it appears as though OR 224 will be rerouted to the Sunrise Corridor once the mainline opens (this summer?). OR 212 will remain on its current routing.
Which actually conflicts with the actual shield posted visible from the (current) OR 224 E->I-205 N ramp... it's an OR 212 shield. I'm keeping my eye on this.
-
Just pinging on this – you had a chance to get over there yet?
-
Just pinging on this – you had a chance to get over there yet?
Last time I drove by there, they replaced the 212 shield with a 224. I haven't been by to see if it's open, but OSM's intimating that it is. If it is, it'll force a pull on the Oregon files I've cleaned up so far (1-98 are done -- including interstates and US routes, working on 99 now).
-
Was there for the ribbon cutting ;) Opened 7/1.
-
Bumping as a reminder to Bickendan. Looks like this still needs to be updated in the Highway Browser.
-
I need to fix my GitHub permissions issues; it's done otherwise.