Highway Data Discussion => Updates to Highway Data => Solved Highway data updates => Topic started by: Markkos1992 on November 27, 2023, 12:45:28 pm
-
This article Bob Malme posted on AARoads indicates that it will open in late Spring 2024. Hopefully, this will be accurate, and we will not have to wait for another year like we did with the East End Connector.
https://www.ncdot.gov/news/press-releases/Pages/2023/2023-11-27-final-contract-awarded-complete-540-phase-2.aspx
Complete 540 Phase 1 extends the Triangle Expressway 18 miles from N.C. 55 to Interstate 40. Complete 540 Phase 1 is currently under construction and is expected to open to traffic in late spring of 2024.
-
It looks like we waited three months. It should be open by Labor Day. (https://www.aaroads.com/forum/index.php?msg=2937354)
Well looks like Debby made Lee Corso say "Not so fast, my friend": https://www.aaroads.com/forum/index.php?msg=2938420
-
Update in that it will open on September 25th: https://www.aaroads.com/forum/index.php?msg=2941189
-
So, it seems that both exits inside of the I-40/42/NC-540 complex interchange are getting separate numbers on I-40.
Exit 310 is coming back, and is for NC-540, while Exit 309 stays with US-70(I-42).
https://www.aaroads.com/forum/index.php?msg=2943699
-
It has opened. (https://www.aaroads.com/forum/index.php?msg=2944160)
-
route extended in TM