Travel Mapping

Highway Data Discussion => Updates to Highway Data => Solved Highway data updates => Topic started by: rickmastfan67 on October 18, 2024, 10:02:29 pm

Title: AB: AB-216 exit 3/4 changes
Post by: rickmastfan67 on October 18, 2024, 10:02:29 pm
3 -> *3 - WB only exit closed sometime between Aug '19 (https://maps.app.goo.gl/aAQzQiwcwZtpeMwN8) & Oct '20 (https://maps.app.goo.gl/5JPp4Rsm9dvKjxkk6) per GSV.
NEW -> 4 - Opened sometime between Aug '19 (https://maps.app.goo.gl/3DZgAKWCfFxktVT47) & Nov '20 (https://maps.app.goo.gl/XQ5buyxDpoVxCRjF6).  Not a replacement for Exit 3, as this new exit is an EB only exit.
Title: Re: AB: AB-216 exit 3/4 changes
Post by: yakra on October 19, 2024, 09:23:14 pm
Debated whether to stil include *3, being right at the edge of 4's footprint, 1PPI & all.
But aah surewhynot.
https://github.com/TravelMapping/HighwayData/pull/7822
Title: Re: AB: AB-216 exit 3/4 changes
Post by: rickmastfan67 on October 19, 2024, 09:32:12 pm
Debated whether to stil include *3, being right at the edge of 4's footprint, 1PPI & all.
But aah surewhynot.
https://github.com/TravelMapping/HighwayData/pull/7822

Well, they are 'technically' two different interchanges, since the WB only one was removed (3), and the new EB only one was built (4).  Don't think something like this would qualify for a 1PPI IMO since there was never an overpass.
Title: Re: AB: AB-216 exit 3/4 changes
Post by: yakra on October 19, 2024, 10:51:10 pm
*3 is in.