Travel Mapping
Highway Data Discussion => Updates to Highway Data => Topic started by: michih on December 22, 2024, 06:51:08 am
-
The final section of A49 is announced to be opened in the first quarter of 2025 (source (https://www.deges.de/aktuelles/neuigkeit/autobahn-gmbh-und-deges-a-49-lueckenschluss-kommt-im-ersten-quartal-2025/)). Since the Autobahn was supposed to be opened this fall, the official toll table (valid from 2025-01-01) does already indicate the new road plus B road dedications (summary (https://www.autobahn-online.de/phorum/read.php?5,194628,202591#msg-202591)).
https://travelmapping.net/hb/showroute.php?r=deuhe.a049&lat=50.859190&lon=9.192467&zoom=11
To do on opening:
- Extend A49 to A5
- Merge B454Tre into main route
- Truncate B454 main route till A49's exit 18
- Reenter B454 remainder west of exit 19
- Add B62 branch from B62 to A49's exit 20
- Adjust L3290 wps with B62
- Add A49's exit 21 for L3072
To do later when road number will be known:
- Add route for former B454 between A49's exit 19 and east of exit 18
- Rename intersecting route wp labels: L3071, L3263, L3342 and B454
Edit 2025-03-08:
- A49 is announced to be opened 2025-03-21
- The new B62 section was removed from the 2025-02-15 mauttabelle (https://www.autobahn-online.de/phorum/read.php?5,194628,202838#msg-202838)
Edit 2025-03-24:
- B62 is also missing from the 2024-04-01 mauttabelle
-
A49 was opened 2025-03-21: https://www.skyscrapercity.com/posts/192572832/
https://github.com/TravelMapping/HighwayData/pull/8270