Author Topic: NC: I-785/840 Extended to US 29  (Read 8080 times)

0 Members and 1 Guest are viewing this topic.

Offline dfilpus

  • Full Member
  • ***
  • Posts: 153
  • Gender: Male
  • Last Login:Today at 01:29:11 pm
    • Filpus Roadgeek
NC: I-785/840 Extended to US 29
« on: December 07, 2017, 09:50:02 am »
« Last Edit: December 08, 2017, 06:18:44 pm by dfilpus »

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 10:22:28 pm
Re: NC: I-785/480 Extended to US 29
« Reply #1 on: December 08, 2017, 05:43:34 pm »
I know it is a typo, but calling I-840 "I-480" may confuse someone.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Today at 07:08:34 pm
Re: NC: I-785/840 Extended to US 29
« Reply #2 on: December 09, 2017, 12:44:30 am »
I also think we should keep the 'I-840' file as 'future' with the extension (for now).

On a side note as well, the current exit '19' (US-70) in both files needs to be changed to '18'.  Picture proof here: http://www.malmeroads.net/ncfutints/futloop.html

Offline dfilpus

  • Full Member
  • ***
  • Posts: 153
  • Gender: Male
  • Last Login:Today at 01:29:11 pm
    • Filpus Roadgeek
Re: NC: I-785/840 Extended to US 29
« Reply #3 on: December 12, 2017, 04:35:50 pm »
I also think we should keep the 'I-840' file as 'future' with the extension (for now).

On a side note as well, the current exit '19' (US-70) in both files needs to be changed to '18'.  Picture proof here: http://www.malmeroads.net/ncfutints/futloop.html
The mile marker for Mile 19 is in the center of the interchange for exit 18. Likewise, the mile marker of Mile 18 is in the center of interchange for exit 17. It is odd.

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1767
  • Last Login:Today at 09:47:09 pm
Re: NC: I-785/840 Extended to US 29
« Reply #4 on: January 01, 2018, 05:14:32 pm »
Some photos in case that's what's causing the delay...



It's marked as I-785 from I-85 north; I-840 hasn't been added to the signs yet







As mentioned previously, I-840 is shown as a future interstate



The current END sign is on the ramp to US29 N
Clinched:

Online mapmikey

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1227
  • Last Login:Today at 10:27:42 pm
    • Co-curator Virginia Highways Project
Re: NC: I-785/840 Extended to US 29
« Reply #5 on: January 01, 2018, 05:23:28 pm »
was waiting on other NC changes...

files submitted this afternoon

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1767
  • Last Login:Today at 09:47:09 pm
Re: NC: I-785/840 Extended to US 29
« Reply #6 on: January 01, 2018, 05:36:24 pm »
Just noticed no one posted the exit number for US29: it's 14.
Clinched:

Online mapmikey

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1227
  • Last Login:Today at 10:27:42 pm
    • Co-curator Virginia Highways Project
Re: NC: I-785/840 Extended to US 29
« Reply #7 on: January 01, 2018, 07:40:24 pm »
I got it from Malme's website...no worries

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Today at 07:08:34 pm
Re: NC: I-785/840 Extended to US 29
« Reply #8 on: January 03, 2018, 11:37:15 pm »
Just noticed on both I-785's and I-840 'Future''s file that the labels are all messed up.

For I-785's file, the '17' & '14' labels are missing the '(840)' part at the end since they are I-840's numbers (to prevent any future duplication problems).

For the I-840 'future' file, there are some problems with it.  All the former 'hidden' labels were deleted.  They should never have been deleted.  However, they are no longer in use, but the '(840)' part needs to be deleted, as those are it's own exit numbers.
"18(840) +19(840)" should be corrected to "18 +18(840) +19(840)"
"21(840)" should be corrected to "21 +21(840)".

Online mapmikey

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1227
  • Last Login:Today at 10:27:42 pm
    • Co-curator Virginia Highways Project
Re: NC: I-785/840 Extended to US 29
« Reply #9 on: January 04, 2018, 06:57:51 am »
corrected and submitted...