I really would have preferred that FDOT used exit numbers on the C/D lanes. I want to go with the old 349 becoming 348B based on the C/D Road exit NB being 348, but the C/D Road exit SB being 350A really confuses things IMO.
Well, on the '350A' issue, the
exit NB was also that number before the conversion (I don't recall there ever being a '350B' going NB, thus no idea why they didn't just do 350 going NB). With the SB ramp still maintaining that number, I have 0 issues keeping that as-is.
And yes, I fully agree with you that they should have added exit numbers on the C/D lanes. Stupid that they didn't. Also, whenever we mark an exit as 'permanently closed' we always keep the exit number, thus you could 'in theory', use that as a justification as well to keep the number as 349 (sans the '*') because of the direct SB offramp to US-90 EB from the mainline being gone, but still having the direct onramp NB. With that reasoning, I think I'll just keep it as '349' unless something changes in the future on the signage when it comes to exit numbers.
On another note, I guess a new segment of FL 5 in Jacksonville will need to be added to the HB.
Already have that file ready to go once I finish dealing with a big post in the usafl thread so I can have a bulk update for FL.