Author Topic: NY: I-390 issues  (Read 3982 times)

0 Members and 1 Guest are viewing this topic.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Yesterday at 11:00:40 pm
NY: I-390 issues
« on: March 18, 2020, 05:19:54 am »
Some issues I noticed with the route.
=====

+X05, +X11, +X12, +X14, +X17 all need to be recentered as they're outside of the highway boundaries.
NEW -> 11A = NY-15 is missing a graph connection here.  Take location from 'I-390(11)' point in NY-15's file.
NEW -> 14B = NY-15A is missing a graph connection here.  Take location from 'I-390(14)' point in NY-15A's file.  Also rename I-390(14) -> I-390(14B) in NY-15A's file. (Based on SB I-390 signage).
14 -> 14A +14
NEW -> 15B = Brighton-Henrietta Town Line Road

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Re: NY: I-390 issues
« Reply #1 on: March 18, 2020, 03:49:39 pm »
Per NB I-390 signage, I didn't see a compelling reason to change the label in NY15A's file.
Everything else implemented. Also, 15 -> 15A +15.

It drives me nuts when DOTs sign out-of-order letter suffixes southbound so drivers will pass Exit 42A before 42B. When numbers are already decreasing, it's illogical, dammit!
See also: NH I-95 3. </rant>

I just gotta remember why I have some stashed unfinished work on NY33, and then I'll get a pull request going.
Derp! That was the last commit on this branch! The stash is actually of I-84's exit number conversion, waiting for field confirmation of 2->4 & 3->15
https://github.com/TravelMapping/HighwayData/pull/3675
« Last Edit: March 18, 2020, 03:59:49 pm by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca