Author Topic: Nebraska Outlook  (Read 35376 times)

0 Members and 1 Guest are viewing this topic.

Online the_spui_ninja

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 803
  • Last Login:Today at 10:12:22 am
  • THE Western SD Highway Nut
Re: Nebraska Outlook
« Reply #30 on: October 25, 2024, 11:48:15 am »
Also, not sure of the timeline on this, but my in-laws were talking about the future four-laning of US 77 from Wahoo to Fremont. It sounds like NDOR wants to Missouri Expressway it (which is dumb, they have the right-of-way to do a new-terrain alignment might as well do it right the first time), so don't think there will be any point updates needed but I'll keep tabs on it.
« Last Edit: October 25, 2024, 11:57:15 am by the_spui_ninja »
An adventure is only an inconvenience rightly considered. An inconvenience is only an adventure wrongly considered. - G.K. Chesterton

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Re: Nebraska Outlook
« Reply #31 on: October 25, 2024, 02:18:07 pm »
2025: Hastings Southeast construction begins
2026: June: Grand Island West
2028: Fall: Mark NE US77 OldCheRd closed
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca