Author Topic: HUN: M44 opening  (Read 3268 times)

0 Members and 1 Guest are viewing this topic.

Offline michih

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4856
  • Last Login:Today at 02:00:57 pm
HUN: M44 opening
« on: September 22, 2021, 02:05:38 pm »
3km of M44 have also been opened in Hungary: https://www.skyscrapercity.com/threads/460510/post-175289517

@panda80 wants to wait with the update till the neighboring section will be opened in December
« Last Edit: September 29, 2021, 11:26:43 am by michih »

Offline michih

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4856
  • Last Login:Today at 02:00:57 pm
Re: HUN: M44 opening
« Reply #1 on: December 15, 2021, 10:32:05 am »
The neighboring 10km long section was opened: https://www.skyscrapercity.com/threads/460510/post-176531951

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3302
  • Last Login:Today at 12:37:57 pm
Re: HUN: M44 opening
« Reply #2 on: December 16, 2021, 02:33:26 am »
There is a duplicate label error with the "+X3" hidden point.

Offline michih

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4856
  • Last Login:Today at 02:00:57 pm
Re: HUN: M44 opening
« Reply #3 on: December 26, 2021, 03:27:20 am »
There is a duplicate label error with the "+X3" hidden point.

I don't think that we need to keep threads open for simple (user-irrelevant) data check errors. Nevertheless, I've fixed it for @panda80: https://github.com/TravelMapping/HighwayData/pull/5458
Marking solved and moving.