Author Topic: AZ: AZ 24 Extension to Ironwood Dr  (Read 2834 times)

0 Members and 1 Guest are viewing this topic.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 06:25:01 pm
« Last Edit: April 10, 2022, 05:12:11 pm by Markkos1992 »

Offline Duke87

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1018
  • Last Login:Today at 03:43:33 pm
Re: AZ: AZ 24 Extension to Ironwood Dr
« Reply #1 on: April 05, 2022, 07:59:25 pm »
Ha, I was staring at this out the window of an airplane as I was leaving PHX last... Thursday, and determined from that view that it was not open yet. Missed it by a day it looks like!

Will address.

EDIT: extension to Williams Field has been addressed, thread moved to Outlook forum since there is further extension still under construction
« Last Edit: April 06, 2022, 07:16:28 pm by Duke87 »

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 06:25:01 pm
Re: AZ: AZ 24 Extension to Ironwood Dr
« Reply #2 on: August 02, 2022, 12:05:23 pm »
This should open in the next 2-3 weeks or so.  (https://www.aaroads.com/forum/index.php?topic=14850.msg2759222#msg2759222)

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 06:25:01 pm
Re: AZ: AZ 24 Extension to Ironwood Dr
« Reply #3 on: August 12, 2022, 06:46:30 am »
Or 9 days (https://www.aaroads.com/forum/index.php?topic=14850.msg2761883#msg2761883)

Also to keep in mind:

Quote
The city of Mesa is working to complete the Signal Butte Road interchange, set to open in 2023, which will connect SR 24 to an extended Signal Butte Road. While that construction takes place, drivers exiting SR 24 at Williams Field Road can access Signal Butte north of the new expressway. Meanwhile, Meridian Road’s access is limited to and from the area south of SR 24, since the road does not extend north of the highway.
« Last Edit: August 12, 2022, 06:48:35 am by Markkos1992 »