Noticed this while working on a GIS project. GA 96 has been relocated onto a new alignment for about 2 miles in Bonaire, including a new interchange at US 129. Based on GMSV and aerial imagery, this was completed sometime between 2017 and early 2019 (first GMSV images are from February 2019).
At a minimum, it will require relocating the US 129/GA 96 point to the new interchange. Don't know if additional points on each end of the realignment would be desirable or not.